Laserfiche WebLink
§ 4.3 Additional Services may be provided after execution of this Agreement, without invalidating the Agreement. <br />Except for services required due to the fault of the Architect, any Additional Services provided in accordance with <br />this Section 4.3 shall entitle the Architect to compensation pursuant to Section 11.3 and an appropriate adjustment in <br />the Architect's schedule. <br />§ 4.3.1 Upon recognizing the need to perform the following Additional Services, the Architect shall notify the Owner <br />with reasonable promptness and explain the facts and circumstances giving rise to the need. The Architect shall not <br />proceed to provide the following services until the Architect receives the Owner's written authorization: <br />.1 Services necessitated by a change in the Initial Information, previous instructions or approvals given <br />by the Owner, or a material change in the Project including, but not limited to, size, quality, <br />complexity, the Owner's schedule or budget for Cost of the Work, or procurement or delivery <br />method; <br />.2 Services necessitated by the Owner's request for extensive environmentally responsible design <br />alternatives, such as unique system designs, in-depth material research, energy modeling, or LEED® <br />certification; <br />.3 Changing or editing previously prepared Instruments of Service necessitated by the enactment or <br />revision of codes, laws or regulations or official interpretations; <br />.4 Services necessitated by decisions of the Owner not rendered in a timely manner or any other failure <br />of performance on the part of the Owner or the Owner's consultants or contractors; <br />.5 Preparing digital data for transmission to the Owner's consultants and contractors, or to other Owner <br />authorized recipients; <br />.6 Preparation of design and documentation for alternate bid or proposal requests proposed by the <br />Owner; <br />.7 Preparation for, and attendance at, a public presentation, meeting or hearing; <br />.8 Preparation for, and attendance at a dispute resolution proceeding or legal proceeding, except where <br />the Architect is party thereto; <br />.9 Evaluation of the qualifications of bidders or persons providing proposals; <br />.10 Consultation concerning replacement of Work resulting from fire or other cause during construction; <br />or <br />.11 Assistance to the Initial Decision Maker, if other than the Architect. <br />§ 4.3.2 To avoid delay in the Construction Phase, the Architect shall provide the following Additional Services, <br />notify the Owner with reasonable promptness, and explain the facts and circumstances giving rise to the need. If the <br />Owner subsequently determines that all or parts of those services are not required, the Owner shall give prompt <br />written notice to the Architect, and the Owner shall have no further obligation to compensate the Architect for those <br />services: <br />.1 Reviewing a Contractor's submittal out of sequence from the submittal schedule agreed to by the <br />Architect; <br />.2 Responding to the Contractor's requests for information that are not prepared in accordance with the <br />Contract Documents or where such information is available to the Contractor from a careful study <br />and comparison of the Contract Documents, field conditions, other Owner -provided information, <br />Contractor -prepared coordination drawings, or prior Project correspondence or documentation; <br />.3 Preparing Change Orders and Construction Change Directives that require evaluation of Contractor's <br />proposals and supporting data, or the preparation or revision of Instruments of Service; <br />.4 Evaluating an extensive number of Claims as the Initial Decision Maker; <br />.5 Evaluating substitutions proposed by the Owner or Contractor and making subsequent revisions to <br />Instruments of Service resulting therefrom; or <br />.6 To the extent the Architect's Basic Services are affected, providing Construction Phase Services 60 <br />days after (1) the date of Substantial Completion of the Work or (2) the anticipated date of <br />Substantial Completion identified in Initial Information, whichever is earlier. <br />§ 4.3.3 The Architect shall provide Construction Phase Services exceeding the limits set forth below as Additional <br />Services. When the limits below are reached, the Architect shall notify the Owner: <br />.1 Two ( 2 ) reviews of each Shop Drawing, Product Data item, sample and similar submittal of <br />the Contractor <br />.2 Bi-Monthly ( 20 ) visits to the site by the Architect over the duration of the Project during <br />construction <br />AIA Document B101.' - 2007 (formerly 6151'^' - 1997). Copyright ® 1974, 1978, 1987, 1997 and 2007 by The American Institute of Architects. <br />All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction <br />r distribution of this AIA® Document, or any portion of it, may result incivil and criminal penalties, and will be prosecuted to <br />' <br />the max extent possible under the law. This draft was produced by AIA software at 10:02:213on 12/17/2007 under Order No.1000305200_1 <br />which expires on 6/14/2008, and is not for resale. <br />User Notes: (434271448) <br />