My WebLink
|
Help
|
About
|
Sign Out
Home
Comprehensive Plan Update
>
Comprehensive Plan
>
Comprehensive Plan (old)
>
1990-1999
>
1995 (Approved)
>
1994 Land Use Study
>
Comprehensive Plan Update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2024 11:57:33 AM
Creation date
8/18/2014 12:38:56 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
315
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
�RL�( <br />ASSOCIATES LTD. <br />Date: <br />To: <br />From: <br />Re: <br />MEMORANDUM <br />April 18, 1994 <br />City of Ramsey Planning Commission <br />Steven Schwanke, John Dietrich, Jeff Smyser <br />RLK Associates <br />April 21, 1994 <br />Planning Commission Work Session <br />Land Use/Transportation Plan Update <br />INTRODUCTION <br />922 Mainstreet <br />Hopkins, Mn. <br />55343 <br />(612) 933-0972 <br />fax: (612) 933-1153 / <br />In December, 1993, RLK Associates and BIKO Associates met with the City of Ramsey <br />Planning Commission to begin the City's land use and transportation planning processes. Since <br />that time, the Planning Commission created a "working group" to meet with the consulting <br />team on the development of draft and working planning documents. <br />The working group met three times to review and discuss material prepared by the consulting <br />team. The enclosed material focuses on several land use and transportation corridors identified <br />by the Planning Commission and/or the working group. This material is draft in nature and <br />should be used for discussion purposes only. The consulting team will be available Thursday <br />evening to answer questions from the Planning Commission and City staff <br />BACKGROUND <br />As part of the land use and transportation planning processes, a background paper was <br />presented and reviewed by the working group. The purpose of the background paper was to <br />establish a brief history of the major planning events. A copy of the background paper has <br />been included as part of this packet. A brief summary of this report follows: <br />1. The City of Ramsey's land use planning activities cover over two decades of <br />work. The 1970's involved several planning efforts. In 1973, prior to <br />incorporating as a City, the Township of Ramsey developed its first <br />comprehensive plan. After incorporating as a City, Ramsey prepared and <br />adopted an Urban Planning District Study and Comprehensive Plan <br />• Civil Engineering • Transportation • Infrastructure Redevelopment <br />• Landscape Architecture • Construction Management <br />
The URL can be used to link to this page
Your browser does not support the video tag.