Laserfiche WebLink
JARVIS STREET <br />COST SHARING <br />STA. 79+00 TO STA. 117+00 <br />CITY OF ELK RIVER <br />NO. <br />STREETS <br />1 MOBILIZATION <br />2 TRAFFIC CONTROL <br />3 RECLAIM BITUMINOUS PAVEMENT (9") <br />4 SUBGRADE EXCAVATION <br />5 COMMON EXCAVATION <br />6 POND EXCAVATION <br />7 GRANULAR BORROW <br />8 AGGREGATE BASE CLASS 5 <br />9 TYPE SP 12.5 WEARING COURSE MIX (4,E) <br />10 TYPE SP 12.5 NON WEARING COURSE MIX (4.6) <br />11 BITUMINOUS TRAIL (10') <br />12 CONCRETE CURB & GUTTER DESIGN B618 <br />13 COMMON TOPSOIL BORROW <br />14 SODDING TYPE LAWN <br />15 STRIPING AND SIGNAGE <br />16 SILT FENCE <br />17 TREE REMOVAL <br />18 REMOVE & REPLACE LANDSCAPING <br />19 LAND ACQUISITION <br />STORM SEWER <br />1 REMOVE CULVERT (RCP) <br />2 REMOVE DRAINAGE STRUCTURE <br />3 CONNECT TO EXISTING <br />4 CONST DRAINAGE STRUCTURE DESIGN G <br />5 CONST DRAINAGE STRUCTURE DES 48-4022 <br />6 CASTINGS <br />7 12" RC PIPE CULVERT <br />8 15" RC PIPE CULVERT <br />9 18" RC PIPE CULVERT <br />iD 12" RC PIPE APRON <br />11 15" RC PIPE APRON <br />12 18' RC PIPE APRON <br />13 RANDOM RIPRAP CLASS IV <br />14 STORM DRAIN INLET PROTECTION <br />ITEM <br />UNITS OTY UNIT PRICE TOTAL PRICE <br />LUMP SUM <br />LUMP SUM <br />SO YD <br />CU YD <br />CU YD <br />CU YD <br />CU YD <br />TON <br />TON <br />TON <br />TON <br />LIN FT <br />CU YD <br />SO YD <br />LUMP SUM <br />LIN FT <br />ACRE <br />LUMP SUM <br />SO FT <br />1.00 <br />1.00 <br />10133 <br />5600 <br />5500 <br />2200 <br />17600 <br />8000 <br />1500 <br />1900 <br />770 <br />7600 <br />2500 <br />15000 <br />1 <br />7600 <br />1.5 <br />1 <br />10000 <br />$15,000.00 <br />$6,000.00 <br />$4.00 <br />$7.00 <br />$8.00 <br />$8.00 <br />$5.00 <br />$12.00 <br />$75.00 <br />$70.00 <br />$100.00 <br />$12.00 <br />$20.00 <br />$3.50 <br />$6,000.00 <br />$3.00 <br />$10,000.00 <br />$5,000.00 <br />$4.00 <br />SUBTOTAL STREETS COST <br />10% CONTINGENCIES <br />TOTAL STREETS COST <br />INDIRECT COSTS (15%) <br />TOTAL STREETS COST <br />TOTAL CITY OF RAMSEY STREETS COST <br />LIN FT <br />EACH <br />EACH <br />LIN FT <br />LIN FT <br />EACH <br />LIN FT <br />LIN FT <br />LIN FT <br />EACH <br />EACH <br />EACH <br />CU YD <br />EACH <br />867 <br />2 <br />3 <br />34 <br />65 <br />24 <br />1257 <br />700 <br />427 <br />2 <br />1 <br />30 <br />24 <br />$10.00 <br />$400.00 <br />$300.00 <br />$260.00 <br />$250.00 <br />$700.00 <br />$32.00 <br />$34.00 <br />$40.00 <br />$600.00 <br />$620.00 <br />$650.00 <br />$80.00 <br />$150.00 <br />SUBTOTAL STORM SEWER COST <br />10% CONTINGENCIES <br />TOTAL STORM SEWER COST <br />INDIRECT COSTS (15%) <br />TOTAL STORM SEWER COST <br />TOTAL CITY OF RAMSEY STORM SEWER COST <br />$15,000.00 <br />$6,000.00 <br />$40,532.00 <br />$39,200.00 <br />$44,000.00 <br />$17,600.00 <br />$813,000.00 <br />$96,000.00 <br />$112,500.00 <br />$133,000.00 <br />$77,000.00 <br />$91,200.00 <br />$50,000.00 <br />$52,500.00 <br />$6,000.00 <br />$22,800.00 <br />$15,000.00 <br />$5,000.00 <br />$40,000.00 <br />$951,332.00 <br />$95,130.00 <br />$1,046,462.00 <br />$157,000.00 <br />$1,203,462.00 <br />$601,731.00 <br />$6,670.00 <br />$800.00 <br />$900.00 <br />$8,840.00 <br />$16,250.00 <br />$16,800.00 <br />$40,224.00 <br />$23,800.00 <br />$17,080.00 <br />$1,200.00 <br />$620.00 <br />$650.00 <br />$2,400.00 <br />$3,600.00 <br />$141,834.00 <br />$14,180.00 <br />$156,014.00 <br />$23,440.00 <br />$179,454.00 <br />$89,727.00 <br />