Laserfiche WebLink
JARVIS STREET <br />COST SHARING <br />STA. 79+00 TO STA. 117+00 <br />CITY OF ELK RIVER <br />NO. <br />ITEM UNITS OTY UNIT PRICE TOTAL PRICE <br />QUIET ZONE AT JARVIS IMPROVEMENTS <br />1 PROPOSED CROSSING SURFACE (INCLUDES CONCRETE PANELS, NEW RAIL, TIES, AND BALLAST) LF 112 $1,400.00 $156,600.00 <br />2 PROPOSED SAFETY MEASURE (TWO -QUADRANT GATE SYSTEM WITH FLASHERS & CWT) LUMP SUM 1 $250,000.00 5250,000.00 <br />3 COMMON EXCAVATION CU YO 150 $14.00 $2,100.00 <br />4 AGGREGATE BASE. CLASS 5 TON 60 $26.00 52,240.00 <br />5 5' CONCRETE WALK SO FT 1000 $6.00 $6,000.00 <br />6 CONCRETE CURB & GUTTER DESIGN B818 (NON -TRAVERSABLE MEDIAN) LIN FT 320 $16.00 $5,760.00 <br />7 TRUNCATED DOMES SOFT 80 $42.00 $3,360.00 <br />8 FLAG PERSON (BNSF CROSSING) LUMP SUM 1 $12,500.00 $12,500.00 <br />9 SIGN PANEL TYPE C SO FT 50 $35.90 $1,750.00 <br />10 HYDRAULIC SOIL STABILIZER, TYPE 5, WITH SEED 8 FERT. SO YD 500 $2.00 $1,000.00 <br />SUBTOTAL QUIET ZONE COST $441,510.00 <br />10% CONTINGENCIES $44,150.00 <br />TOTAL QUIET ZONE COST $485,660.00 <br />INDIRECT COSTS (15%) $72,880.00 <br />TOTAL QUIET ZONE COST $558,540.06 <br />TOTAL CITY OF RAMSEY QUIET ZONE COST $279,270.00 <br />TOTAL CITY OF RAMSEY CONTRIBUTION $970,728.00 <br />