Laserfiche WebLink
101 <br />7. <br />section 1 101, to cover the costs incurrcd by the city, then the city may assess the remaining <br />The City engineer shall review the stormwater pollution control plan. <br />Section 117 -402 is hereby amended as follows (additions indicated as underline, deletions indicated as <br />strike-through): <br />Sec. 117 -402. - Variance. Permit required. <br />If the city determines that the stormwater pollution control plan meets the requirements of this subdivision, <br />the city shall issue a permit valid for a specified period of time that authorizes the land disturbance activity <br />contingent on the implementation and completion of this plan. <br />Section 117 -403 is hereby amended as follows (additions indicated as underline, deletions indicated as <br />strike-threugh): <br />Sec. 117 -403. — Enforcement. Denial. <br />If the city determines that the stormwater pollution control plan does not meet the requirements of this <br />subdivision, the city shall not issue a permit for the land disturbance activity. All land use and building <br />permits for the site in question must be suspended until the developer has an approved stormwater pollution <br />control plan. <br />Section 117 -404 is hereby amended as follows (additions indicated as underline, deletions indicated as <br />strip): <br />Sec. 117 -404. — <br />Modification of plan. <br />An approved stormwater pollution control plan may be modified on submission of a written application for <br />modification to the city, and after written approval by the city engineer. In reviewing such an application, <br />the city engineer may require additional reports and data. <br />Sections 117 -405 through 117 -410 are hereby added as follows (additions indicated as underline, deletions <br />indicated as strile-through): <br />