Laserfiche WebLink
EVALUATION OF CONCEPTS <br />• 156th St. Extension - Project 1-1-1 <br />• South Frontage Road Extension — Project 1-1-2 <br />• RCUT at Alpine Dr., Turn Lane Improvements and South Frontage Road — Project 1-1-3 <br />• RCUT at Bowers Dr. with Turn Lane Improvements — Project 1-1-4 <br />• Riverdale Blvd Extension to Bowers Dr. — Project 1-1-5 <br />• South Frontage Road Extension (Traprock St. to Ramsey Blvd) — Project 3-1-1 <br />• Civic Center Dr. Extension to Ramsey Blvd — Project 3-1-2 <br />• Purchase Right -of -Way on North Side of Highway 10 (Armstrong Blvd to Ramsey Blvd) — Project 3-1-3 <br />• Realign Highway 10 between Ramsey and Sunfish Lake Blvds and Construct North Frontage Road — Project 3-1-4 <br />• McKinley St. Extension — Project 4-1-1 <br />• North Frontage Road from Sunfish Lake Blvd to Anoka Tech — Project 4-1-2 <br />• Extend Riverdale Dr. East of Tungsten St.; Remove Driveways on Eastbound Highway 10 Between Sunfish <br />Lake Blvd and Tungsten St. — Project 4-1-3 and 4-1-4 <br />• Remove Fairoak Signal — Project 5-1-1 <br />• Extension of South Frontage Road from Fairoak Ave. to Main St. — Project 5-1-3 <br />HIGHWAY 10 ACCESS PLANNING STUDY 61 <br />