Laserfiche WebLink
EVALUATION OF CONCEPTS <br />Project Group 2 — Fairoak Signal Removal <br />The second project group to be built includes removing the traffic signal at Fairoak Ave. (Project 5-1-21. In <br />reality, Project 5-1-3 would likely also be built at or around this time, however it was not modeled as part of the <br />project groups since the concept was not completed until after the analysis was completed. <br />500 <br />450 <br />400 <br />350 <br />= 300 <br />3 <br />p 250 <br />m <br />g 200 <br />z <br />150 <br />100 <br />50 <br />0 <br />Armstrong <br />Anticipated 10-Year Crash Count <br />Ramsey Sunfish Lake Thurston <br />Fairoak <br />Anticipated Crashes <br />Previous Crashes <br />Intersection Delay <br />a <br />150 <br />Jarvis Alpine Ar ustrong Ramsey Sunfish Lake Thurston Fairoak <br />■ AM Peak <br />■ PM Peak <br />— AM Previous <br />—PM Previous <br />HIGHWAY 10 ACCESS PLANNING STUDY <br />63 <br />