My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Economic Development Authority - 10/09/2014
Ramsey
>
Public
>
Agendas
>
Economic Development Authority
>
2014
>
Agenda - Economic Development Authority - 10/09/2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 1:29:10 PM
Creation date
10/9/2014 9:13:19 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Economic Development Authority
Document Date
10/09/2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
322
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 5: SCOPE OF SERVICES <br />A. TRAFFIC IMPACT STUDY: Based on future landuses indicated in the Appendix, the City would like <br />a traffic impact study conducted to determine traffic forecasts on Bunker Lake Boulevard and <br />Puma Street. The purpose of this information is to determine minimum roadway design <br />specifications for future improvements to Bunker Lake Boulevard and Puma Street. <br />B. FEASIBILITY REPORT: Based on a completed traffic impact study, the City would like a concept <br />design completed and a preliminary cost estimate developed for any required improvements to <br />Bunker Lake Boulevard and Puma Street. The purpose of this initial layout is to establish a visual <br />concept of required future roadway improvements; and provide a foundation for budgeting <br />discussions among City officials. This stage does not preliminary design (see step below). <br />C. LAYOUTS/PLANS & SPECIFICATIONS FOR PRELIMINARY DESIGN: Develop preliminary roadway <br />and intersection design and specifications based on Municipal State -Aid minimum standards and <br />City of Ramsey development standards. This work should include a refined project budget. <br />D. Work with (and advise) City on strategies for infrastructure design. <br />E. Work with (and advise) City on strategies for assessing/paying for required infrastructure. <br />F. Provide regular activity updates, verbally, to the City's development team, a minimum two times <br />per month <br />G. Completion dates: <br />a. Traffic Impact Study <br />b. Feasibility Report <br />c. Layout/Plans & Specifications for Preliminary Design <br />February 06, 2015 <br />February 06, 2015 <br />March 06, 2015 <br />RFQ Future Business Park Professional Services: City of Ramsey 09/25/2014 Page 5 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.