My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council Work Session - 10/14/2014
Ramsey
>
Public
>
Agendas
>
Council Work Session
>
2014
>
Agenda - Council Work Session - 10/14/2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 4:27:41 PM
Creation date
10/15/2014 9:33:59 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council Work Session
Document Date
10/14/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
190
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
grading, Developer's engineer shall certify in writing that the plat is graded to the <br />approved plans and that all unbuildable soils are removed within the street right-of-way <br />and within the bendable area identified herein. The yard shall be graded to allow the <br />construction of la driveway. A grading, drainage and erosion control plan with <br />maximum two foot contours and cross sections as necessary shall be submitted and <br />'approved by the City prior to commencement of any site grading. Also, the Developer <br />agrees prior te commencement of construction to call a pre -construction meeting <br />between the City, Developer and contractors for the site grading. <br />B. The Developer shall control soil erosion insuring: <br />1. All c1e,eEoprnent shall conform to the natural limitations presented by the <br />tOpog phy and soil of the subdivision in order to create the best potential for <br />preve ting soil erosion. The Developer shall submit an erosion control plan <br />as p&rt of the grading and drainage plan, detailing all erosion control <br />meas ,Ltre s to be implemented during construction, said plan shall be <br />apprised by the City prior to the commencement of site grading or <br />const iuctiori. The developer shall also submit a copy of their Storm Water <br />Pollut on Prevention Plan (SWPPP) to the City prior to commencement of <br />site wading or construction. <br />2. Erosion and siltation control measures shall be Coordinated with the different. <br />stage • of development. Appropriate control measures as required by the <br />City 4haU be installed prior to development when necessary to control <br />erosi <br />• • 3. Land hail be developed in increments of workable size such that adequate <br />erosi n and siltation controls can be provided as construction progresses. <br />The maliest practical area of land shall be 'exposed at any one period of <br />time. <br />4. 1Nher--, the topsoil is removed, sufficient arable soil shall be set aside for. <br />respr ading over the developed area and also seeded, mulched, and disk <br />anch red. The topsoil shall be restored to a depth of at least folk (4) inches, <br />and hall be of a quality at least equal to the soil quality prior tb <br />devel pment. <br />C. The Developer shall be responsible to maintain the required tree protection during all. <br />grading activitie, until removal is approved by the City's Natural Resources Technician. <br />Upon issuance f a building permit for a lot, the Developer is responsible to notify the <br />builders andfor *ndividual owners within the development that they assume and are <br />responsible for drosion control, including sodding .of boulevards, seeding or sodding of <br />the front and side yards of all lots, tree protection and protection of water and sewer <br />services. Such iotification shall not relieve the Developer of the responsibility for such <br />items as require4 under this contract. Any violation will be cause for red tagging the <br />site by the Citl Building Official, or designee, and all inspections will cease until <br />corrected. <br />-2- <br />
The URL can be used to link to this page
Your browser does not support the video tag.