Laserfiche WebLink
AN ❑OVER st'E~CMAI ASSESSMENTS - <br />- N' <br />Project Name: Project No. : <br />• Feasibility Report Amount: $0,00 <br />Contract Award Amount: $0.00 <br />Final Cousruction Sanitary Sewer $0.00 <br />.Water Main •$0,00 " <br />.'Storm Sewer $0.00 <br />• Streets and Restoration $0,00 <br />Amounti $0,00 <br />Final Er:eenses <br />Engineering (includes ins 3ectlan): $0.00 <br />Consulting Costs • $0,00 <br />Aerial Mapping (1%a of ONO) $0,00 <br />Drainage Plan (O,S% of sMreetfstorm) $0,00 <br />Administration (3%) - $0,00 <br />Assessing (VA) $0,00 <br />Handing (0,5%) $0.00 <br />Recording Fees !Legal &>Easement $0,00 <br />Advertising $0,00 <br />Permit and Review Fees $0.00 <br />Street Signs (Matertais and Labor) $0,00 <br />Material Testing $0,00 <br />Construction interest $0.00 <br />City Costs $0.00 <br />Total Final Expenses • $0,00, <br />Expenses Multiplter #D V10t <br />Final Project Cost Arrroui➢€: <br />$0,00 <br />Trunk Saurrs and Stor-e <br />Water Main: Connection Marge EA $3,15400-• $0.00 <br />Area Charr„o AC $2,889.01Fr $0.00 <br />Lateral Chime LF $0.00 $0,00 <br />San. Sewer: Connection :Marge EA . $402.00" $0.00 <br />Area Gharcv AC $1,491.00' $0.00 <br />LatendChucge LF $0.00 $000 <br />Storm Drainage: Area Ct ergs AC $0,00 $0.00 <br />Street; Seal Coating SY $2,00 $0,00 <br />=2008 Rates (adjusted annualiyand'identified late FeeSohedufo) <br />Total Tarnk Source and $taeane $Q.40 <br />Previous Assesstttents <br />(SanitarySeWerArca OE rge) Units $0.00 $0,oa <br />(Sanitary Sewer Lateral CT -large) Units .$0,00 $0,00 <br />(Water Main Lateral Charge) Units $0.00 $0.00 <br />(Water Main Area Charge/ Units $0,00 $0.00 <br />(Street/StormSealer) Units. $4.00 $0.00 <br />(Sanitary Sewer Connect( m) Units $0.00 $0,00 <br />(Water Main connection) Units $0.00 $0.00 <br />Total Amount to 6e Ass.:saed <br />esfiiFilatedAsse`ssirieit jii r'Uni€=' <br />$0.00 <br />O�U`0 $0,0fi • til7iVrai / l9niE <br />