Laserfiche WebLink
plan, wil[ provide space for 56 cars a', 300 square feet ps; car. The costs t~sted tot each ~lerr, <br />are Dased on'estimates trom contractors, HaKanson Anderson, or the City's Engmeerm~ <br />Department, Tr~e Oily will also need to add the cos1 ol goals for the soccer field and trail <br />development, p~cmc benches and landscaping wn~cf~ may add another $25,000 to the total cost ol <br />the park. These costs are included in the "miscellaneous costs" line. <br /> <br />Fiintwood <br /> <br />Hills Park <br />Im~)rovement <br />Tot Lot <br />Trail Connections <br />Administration/Engineering <br />Park Total <br /> <br />$20,000.00 <br />$10,000.00 <br /> @15% <br /> <br />Imorovement Cost <br /> $20,000.00 <br /> $10.000.00 <br /> $4,500.00 <br /> $34,500.00 <br /> <br />The Flintwood Hills Parks would be connected to the trail system and have the currenl <br />equipment upgraded to current industry standards. <br /> <br />Hunters <br /> <br />Hills Park <br />l~Dr0vement Itemized Cost Improvement Cost <br />Tot Lol $20,000.00 $20,000.00 <br />Trail Connections $5.000.00 $5,000.00 <br />Administration/E ng inee ring L~ 15% $ 3,750.00 <br />Park Total $28,750.00 <br /> <br />The Hunters Hill Park would be connected to the trail system and have the current equipment <br /> <br />upgraded to current industry standards. <br /> <br />Wood Pond Hills Trail <br /> Improvement <br /> Trail Connections <br /> Administration/Engineerin9 <br /> Park Total <br /> <br />Itemized Cost Improvement Cost <br /> <br />$35,000.00 $35,000.00 <br /> @15% $5.250.00 <br /> $40,25O .00 <br /> <br />The total estimaled cost of this area excludes trail connections to Ramsey Elementary School <br />exiting from Wood Pond Hills and the trail extension from Fiintwood Hills to Wood Pond Hills.. <br />The future development of trail corridor should be addressed when the vacant properties are <br />developed. <br /> <br />Cedar Hills Park <br />~'iintwood Hills Park <br />Hunters Hill ~ark <br />Wood =ond Hills Trail <br />Total <br /> <br />$I 30.069.00 <br /> $34.500.00 <br /> $25.750.00 <br /> $40.250.00 <br /> <br />S233,569.00 <br /> <br />The following sections of trail will also have to be developed in the future. <br /> <br />Hun~ers Hill Park to Sunfish Lake Drive <br />Wood Pond Hills to Ramsev Elementary. Schoo! <br />Flintwood Hills 1.o Wood Pond Hills <br /> <br /> <br />