Laserfiche WebLink
DATE <br />PROJECT. TITLE <br />ESCROW # <br />DEPARTMENT: Engineering <br />Name: Leonard Linton <br />TECHNICAL REVIEWER: Phone: 763 433-9834 <br />Email: llinton(a,ci.ramsev.mn.us <br />CITY OF RAMSEY LAND USE APPLICATION <br />TECHNICAL REVIEW FILE <br />NOVEMBER PROJECT ADDRESS ALPINE DRIVE AND HELIUM <br />24,2014 STREET <br />FIRE STATION NO. 2 PRELIMINARY PLAN REVIEW <br />We offer the following comments regarding updated plans dated November 17, 2014 prepared by <br />Wenck in association with BKV Group. <br />Staff offers the following comments: <br />Sheet Certificate of Survey <br />1. City Code requires identifying all trees 4" and larger. <br />2. City Code requires extending the survey to 100 feet beyond the property lines on all sides <br />of the project. <br />Sheet C102 <br />1. Install signs indicating trail and sidewalk will be closed. <br />2. Add note: "Sawcut concrete curb full depth prior to removal." <br />3. Add note: "Sawcut concrete sidewalk full depth prior to removal. <br />4. Add note: "Sawcut bituminous pavement full depth prior to removal. Sawcut shall be 1 <br />foot from face of curb. Mill existing wear course 1 foot wide prior to replacing pavement <br />so that vertical joints are offset. <br />5. Remove sidewalk with curb removal for new driveways. <br />Sheet C103 <br />1. Coordinate fence removal, construction of retaining wall and new fence to maintain <br />security of tower site. <br />Sheet C201 <br />1. All watermain shall be DIP. 8" and larger DIP shall be class 52. 6" and smaller DIP <br />shall be Class 53. <br />2. Provide 6" gate valve in service line to building. <br />3. Change 9xx.xx to 8xx.xx for CBMH 3. <br />4. Label storm sewer pipes with length, size, and slope. Label storm sewer structures with <br />rim elevation, invert elevation and structure size. <br />