Laserfiche WebLink
Review File: Fire Station No. 2 <br />Preliminary Plan Review <br />Engineering Review <br />November 24, 2014 <br />Page 2 of 2 <br />5. Consider placing EOF for dry pond in CBMH 3. Invert must be set above 100 year high <br />water level. <br />Sheet C301 <br />1. Plans for retaining wall must be signed by an engineer. <br />2. Topsoil must meet the Ramsey specifications. <br />3. The cross slope on sidewalks and trails at driveways must not exceed 2%. <br />4. Label slopes on paved surfaces. <br />5. It is recommended that the project provide a depressed area south of car parking lot for <br />infiltration/ snow storage. Contours along south edge do not depict surmountable/ ribbon <br />curb. <br />Sheet 401 <br />1. Rock construction entrances are ineffective for removing Ramsey soils from tires. Add <br />note to plan "Contractor shall have sweeper on site or available within 3 hours of <br />notification by City that soils must be removed from adjacent streets. <br />2. Verify date of geotechnical report. <br />Sheet 501 <br />1. Sediment Control Inlet Hat shall not be used in paved areas. <br />2. Concrete thrust blocks are not required. Mega -lugs are required on all joints. <br />3. Intent of biolog detail is not clear. <br />