Laserfiche WebLink
D. E~ss~on ?es~£ng. <br /> <br /> The emission testing was conducted in December of 1990. The <br />report of testing was filed with ~he city as soon as available. <br /> <br />E. sanitary Sewer Petition. <br /> <br /> The petition for connection to city sewer and wa~er was filed <br />within 3~ days of the last CUP. The permit-holder has received no <br />notice of mny action regarding that petition. The permit-holder <br />is willing~ito comply with the city requirements when those details <br />can be worked out. <br /> <br />F. Electrical. <br /> <br /> The bUilding's electrical system was brought up to code and <br />was inspected within 30 days of the last CUP. <br /> <br />4 <br /> <br />7 <br /> <br /> <br />