Laserfiche WebLink
the fact that the City does have the easement provides the City with the advantage <br />of constructing this segment of roadway at some future date without having to bear <br />the costs of obtaining right-of-way, Should the City elect to proceed in such a <br />manner; however, it would bear the cost of constructing the roadway rather than <br />have it be constructed and dedicated by the developer under the normal platting <br />procedure, <br /> <br />I am presuming the developer is requesting this vacation because he believes this <br />connection is inappropriate from a planning standpoint. I would reserve making a <br />recommendation on this request until I receive additional input from both the <br />developer and the Planning and Zoning Commission on this particular issue. <br /> <br />Sincerely, <br /> <br />CITY OF RAMSEY <br /> <br />Steven J Jankowsk~, P E <br />City Engineer <br /> <br />SJJ:ccr <br /> <br /> <br />