Laserfiche WebLink
become objectionable due to intermittence, beat frequency, <br />shrillness or intensity. At the property line, the sound pressure <br />level cf noise radiated continuously from a facility shall not exceed <br />the values given in Table I herein. <br /> <br />TABLE ! <br /> <br />Maximum permissible sound-pressure levels at specified points of <br />measurement for noise radiated continuously from a facility. <br /> <br />Frequency Band Maxi. Permitted Sound <br />Cycles Per Second Level CDecibels) <br /> <br />20 75 7 2 <br /> <br />75 150 67 <br /> <br />t50 - 300 59 <br /> <br />300 - 600 52 <br /> <br />600 1,200 46 <br /> <br />1,200 2,4O0 40 <br /> <br />2,400 4,800 34 <br /> <br />Over 4,800 32 <br /> <br />Bo <br /> <br />Odor: No activity or operation shall cause at any time the <br />discharge of odorous matter in such concentrations as to be readily <br />detectable at any point along the property boundary line or in such <br />concentration as to create a public nuisance or hazard beyond such <br />boundary line. Detailed plans for the prevention of odors crossing <br />property lines may be required before the issuance of a building <br />permit. . ~ <br /> <br />Glare whether direct or reflected, such as fr-enT"f~odlights or high <br />temperature process, and as differentiated from general <br />illumination, shall not be visible at any property line. <br />Exterior lighting: Any lights used for exterior illumination shall <br />direct light away from adjoining pr~--../ <br />Vibration shall not be discernible at any property line to the <br />human sense of feeling for three minutes or more duration in any <br />one hour. Vibration of any kind shall not produce at any time an <br /> <br /> r~ .4 / acceleration of more than 0.1 gravities or shall re,,s, ult ,!n any <br />/9 ~_.c..~ . ./ ,~ combination of amplitudes and frequencies beyond the safe range <br />(//j~.;.~.' ¢1~'"'~'~/~/ or Table Vll, United States Bureau of Mines Bulletin No. 442, <br />"--'~,t~.~-,''~ ''' . "Seismic Effects of Quarry Blasting" on any structure. The <br /> (-'h' ~' ~q,,1 ~ z.. I-Jj¢,'~ methods and equations of Bulletin No. 442 shall be used to compute <br /> ~ / / ~ -..~ ,~ /¢~ all values for the enforcement of this provision. <br /> <br />11 <br /> <br /> <br />