Laserfiche WebLink
I <br />Io <br />I <br />I Medlu~ lntensltv ADDroach Liohtina Svstem with Runway Al lonment <br /> Indlca~tortLlahts'(MA'L~R). Fero~s Falls 'Hun IciDal Airport: F-eraus <br />I Fal IS:! Hil~ne~ofa; 1982 .... <br /> Prepa~ediplans and speclflcatlons and are providing general <br />i const!rucitlon engineering supervision for an approach lighting <br /> system:. This project Is under construction contract at $97,000. <br />I Gl®nW°od Municipal Airport <br /> <br /> Airport ExDanslon. Glenwood MunlciDal Air~ort. Glenwood. Minnesota. <br />i 197~~ ~ ....... <br /> Prepared]airport master plan, alrport zoning maps, environmental <br />i lmpaC~r~ assessment report, plans and specifications and provided <br /> construction engineering for new bltumlnous runway, taxlway and <br /> apron,il and provided engineering assistance for land acquisition. <br /> Total :conStruction cost for this phase of work was $220,000. <br />I/ st. Cloud Municipal Airport <br />I Firs~taae Develooment_.. St. Cloud Municipal Airport. St. ClOud. <br /> Ml_nn~t,~_~ 1970 ..... <br />I Prepar~edialrport layout plan, airport zoning maps, plans <br /> and <br /> spec]lflcatlons and provided construction englneerlng for a new <br /> airpor~¢ i~cludlng runways~ taxlways, aprons, roadways, parking lots, <br />I term-l~al :building, T-hangars, and lighting. Total project cost for <br /> this Work,was $1.0 mllllon. <br /> <br />I Haste? Plan S~.. CJoud MuniciPal AjLl?Dort. City of St. Cloud. <br /> <br /> The Sit. Cloud Airport Is a moderate sized facility located in <br />I central Nlinnesota. Projections Indicate an increase in based <br /> alrcr~f_, tl fr°m 50 to 122 In the next 25 years and a similar Increase <br />I In aircraft movements from 61,700 to 122,730 in the next 25 years. <br />! <br /> <br /> <br />