My WebLink
|
Help
|
About
|
Sign Out
Home
04/30/86 Special Meeting
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Airport Commission
>
Minutes
>
1986
>
04/30/86 Special Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2025 9:34:48 AM
Creation date
2/23/2004 9:29:04 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Minutes
Document Title
Airport Commission - Special
Document Date
04/30/1986
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> Ie <br /> <br /> I <br /> I TKDAtis re!aster plan Included lengthening runways, addition of <br /> parall~el ~axlways, Installation of navlgatlonal aids and a control <br /> I tower~c~nstructlon of additional hangers and terminal space and <br /> also I~ a~ldressed the feasibility of a float plane pond adjacent to <br /> the alrP&rt. The total development program was estimated to cost <br /> I $2.5 I~'II lion. <br /> ~L~pjA~c:L~[xpanslon: St. Cloud Munj_c_Lg_aJ_AjLr.Dort, St. Cloud, <br /> I MI nne~ta~ 1978 <br /> Prepa~red plans and speclflcations and provided construction <br /> · <br /> engln~eri~g for taxlways, apron expansion, building area expansion <br /> I and at'trance road as well as providing land acquisition assistance. <br /> Total ~onStructlon cost for this phase of work was $325,000. <br /> <br /> r <br /> I Pralrl~ du Chlen Airport <br /> <br /> Al~rp~i?t E. xpanslon, Prairie du Chlen Airport, Prairie du Chlen, <br />lO WI:scads I n '. 1984 <br /> Provided design and construction engineering services for the <br /> I expan~lonlof the Prairie due Chien Airport The project Involves <br /> the r~ecornstruction, extension and wl'denlng of the runway; <br /> reconStruCtion of the taxlway and apron; Installation of a medium <br /> I IntenSitY runway edge lighting system (MIRL); relocation of two <br /> roads~ o~e a public road, the other a private entrance road; <br /> instaila~lon of a new 12-foot lighted wind cone; relocation of the <br /> wlnd ~ee;!and the removal and replacement of the existing perimeter <br /> I fence: at :a new location. Estimated cost Is $500,000. Construction <br /> phase'~Wll begin August, 1984. <br /> ! <br /> ! <br /> ! <br /> ! <br /> <br /> ! <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.