Laserfiche WebLink
I <br /> Ie <br /> <br /> I <br /> I TKDAtis re!aster plan Included lengthening runways, addition of <br /> parall~el ~axlways, Installation of navlgatlonal aids and a control <br /> I tower~c~nstructlon of additional hangers and terminal space and <br /> also I~ a~ldressed the feasibility of a float plane pond adjacent to <br /> the alrP&rt. The total development program was estimated to cost <br /> I $2.5 I~'II lion. <br /> ~L~pjA~c:L~[xpanslon: St. Cloud Munj_c_Lg_aJ_AjLr.Dort, St. Cloud, <br /> I MI nne~ta~ 1978 <br /> Prepa~red plans and speclflcations and provided construction <br /> · <br /> engln~eri~g for taxlways, apron expansion, building area expansion <br /> I and at'trance road as well as providing land acquisition assistance. <br /> Total ~onStructlon cost for this phase of work was $325,000. <br /> <br /> r <br /> I Pralrl~ du Chlen Airport <br /> <br /> Al~rp~i?t E. xpanslon, Prairie du Chlen Airport, Prairie du Chlen, <br />lO WI:scads I n '. 1984 <br /> Provided design and construction engineering services for the <br /> I expan~lonlof the Prairie due Chien Airport The project Involves <br /> the r~ecornstruction, extension and wl'denlng of the runway; <br /> reconStruCtion of the taxlway and apron; Installation of a medium <br /> I IntenSitY runway edge lighting system (MIRL); relocation of two <br /> roads~ o~e a public road, the other a private entrance road; <br /> instaila~lon of a new 12-foot lighted wind cone; relocation of the <br /> wlnd ~ee;!and the removal and replacement of the existing perimeter <br /> I fence: at :a new location. Estimated cost Is $500,000. Construction <br /> phase'~Wll begin August, 1984. <br /> ! <br /> ! <br /> ! <br /> ! <br /> <br /> ! <br /> <br /> <br />