Laserfiche WebLink
Page 2 ~ <br />September 161, 1985 <br /> <br />The Master Plan Study for the Airport has taken the expected operating <br />life of the ~la~dfill (mid-1986 to 1987) into consideration. Thus, any <br />alteration or modification to the current landfill license which <br />yields additional operating capability beyond the existing time frame <br />not only prolongs the potential hazard to aviation, but may jeopardize <br />the future ~acility improvements at Gateway North. <br /> <br />Thank you f~r the opportunity to provide input to this issue. <br />Sincerely, <br /> <br />HAKANSON ANDERSON ASSOCIATES, INC. <br />;~cand O~t0~' 7 - <br /> <br />cc: <br /> <br />Jack IpPle, Chman. Airport Commission <br />Lloyd Schnelle, City Administrator <br />Natali~ Haas, County Commissioner <br />Steve Sucks, Mn/DOT Safety & Regulations <br />Mark R~an, Metropolitan Council <br />Bruce Nelson, M/PCA, Solid Waste Division <br /> <br />File: <br /> <br />RA10:,01-2 <br /> <br /> <br />