Laserfiche WebLink
MILL AND OVERLAY & RECLAIM <br />PRELIMINARY COST ESTIMATE <br />CITY OF ELK RIVER <br />ITEM <br />NO. <br />MN/DOT <br />SPEC NO. <br />ITEM DESCRIPTION NOTES <br />UNIT <br />TOTAL <br />QUANTITY <br />UNIT <br />COST <br />TOTAL <br />COST <br />SCHOOL STREET <br />1 <br />2021.501 <br />MOBILIZATION <br />LUMP SUM <br />1 <br />$20,000.00 <br />$20,000.00 <br />2 <br />2104.501 <br />REMOVE AND REPLACE CURB AND GUTTER <br />LIN FT <br />50 <br />$20.00 <br />$1,000.00 <br />3 <br />2104.505 <br />REMOVE CONCRETE DRIVEWAY PAVEMENT <br />SQ YD <br />20 <br />$6.00 <br />$120.00 <br />4 <br />2105.507 <br />SUBGRADE EXCAVATION (EV) <br />CU YD <br />50 <br />$20.00 <br />$1,000.00 <br />5 <br />2211.503 <br />AGGREGATE BASE CLASS 5 <br />CU YD <br />50 <br />$30.00 <br />$1,500.00 <br />6 <br />2231.501 <br />BITUMINOUS PATCHING MIXTURE <br />TON <br />175 <br />$100.00 <br />$17,500.00 <br />7 <br />2232.501 <br />MILL BITUMINOUS SURFACE (2.0") <br />SQ YD <br />4450 <br />$2.50 <br />$11,125.00 <br />6 <br />2232.604 <br />EDGE MILL BITUMINOUS SURFACE 6' WIDE (0.0" TO 2") <br />SQ YD <br />7145 <br />$1.50 <br />$10,717.50 <br />9 <br />2360.501 <br />TYPE SP 12.5 WEARING COURSE (2,C) (SPWEB240C) (2360) <br />TON <br />3400 <br />$75.00 <br />$255,000.00 <br />10 <br />2504.602 <br />ADJUST GATE VALVE <br />EACH <br />12 <br />$350.00 <br />$4,200.00 <br />11 <br />2504.602 <br />RECONSTRUCT VALVE BOX <br />EACH <br />4 <br />$500.00 <br />$2,000.00 <br />12 <br />2506.522 <br />ADJUST FRAME & RING CASTING <br />EACH <br />13 <br />$400.00 <br />$5,200.00 <br />13 <br />2531.507 <br />6" CONCRETE DRIVEWAY PAVEMENT <br />SO FT <br />20 <br />$52.00 <br />$1,040.00 <br />14 <br />2563.601 <br />TRAFFIC CONTROL <br />LUMP SUM <br />1 <br />$5,000.00 <br />$5,000.00 <br />15 <br />2573.530 <br />STORM DRAIN INLET PROTECTION <br />EACH <br />18 <br />$150.00 <br />$2,700.00 <br />16 <br />2582.501 <br />PAVEMENT MESSAGE (LEFT TURN ARROW) EPDXY <br />EACH <br />9 <br />$180.00 <br />$1,620.00 <br />17 <br />2582.501 <br />PAVEMENT MESSAGE (RIGHT TURN ARROW) EPDXY <br />EACH <br />6 <br />$180.00 <br />$1,080.00 <br />16 <br />2582.501 <br />PAVEMENT MESSAGE (LEFT-THRU ARROW) EPDXY <br />EACH <br />2 <br />$180.00 <br />$360.00 <br />19 <br />2582.501 <br />PAVEMENT MESSAGE (THRU ARROW) EPDXY <br />EACH <br />2 <br />$180.00 <br />$360.00 <br />20 <br />2582.502 <br />4" SOLID LINE WHITE -EPDXY <br />LIN FT <br />1490 <br />$0.90 <br />$1,341.00 <br />21 <br />2582.502 <br />4" BROKEN LINE WHITE -EPDXY <br />LIN FT <br />1660 <br />$0.90 <br />$1,494.00 <br />22 <br />2582.502 <br />24" SOLID LINE WHITE -EPDXY <br />LIN FT <br />135 <br />$8.50 <br />$1,147.50 <br />23 <br />2582.502 <br />4" DOUBLE SOLID LINE YELLOW -EPDXY <br />LIN FT <br />3780 <br />$1.50 <br />$5,670.00 <br />24 <br />2582.503 <br />CROSSWALK MARKING -EPDXY <br />SO FT <br />1314 <br />$7.50 <br />$9,855.00 <br />TOTAL COST SCHOOL STREET IMPROVEMENTS: <br />$361,030.00 <br />8TH STREET AREA <br />1 <br />2021.501 <br />MOBILIZATION <br />LUMP SUM <br />1 <br />$2,000.00 <br />$2,000.00 <br />2 <br />2104.505 <br />REMOVE CONCRETE DRIVEWAY PAVEMENT <br />SQ YD <br />10 <br />$8.00 <br />$80.00 <br />3 <br />2231.501 <br />BITUMINOUS PATCHING MIXTURE <br />TON <br />40 <br />$100.00 <br />$4,000.00 <br />4 <br />2232.604 <br />EDGE MILL BITUMINOUS SURFACE 6' WIDE (0.0" TO 2") <br />SQ YD <br />1110 <br />$1.50 <br />$1,665.00 <br />5 <br />2360.501 <br />TYPE SP 12.5 WEARING COURSE (2,C) (SPWEB240C) (2360) <br />TON <br />350 <br />$75.00 <br />$26,250.00 <br />6 <br />2506.522 <br />ADJUST FRAME & RING CASTING <br />EACH <br />13 <br />$400.00 <br />$5,200.00 <br />7 <br />2531.507 <br />6" CONCRETE DRIVEWAY PAVEMENT <br />SO YD <br />10 <br />$52.00 <br />$520.00 <br />6 <br />2573.530 <br />STORM DRAIN INLET PROTECTION <br />EACH <br />1 <br />$150.00 <br />$150.00 <br />9 <br />2582.502 <br />24" SOLID LINE WHITE -EPDXY <br />LIN FT <br />16 <br />$8.50 <br />$136.00 <br />10 <br />2582.503 <br />CROSSWALK MARKING -EPDXY <br />SO FT <br />144 <br />$6.00 <br />$864.00 <br />TOTAL COST STH STREET IMPROVEMENTS: <br />$40,865.00 <br />ELK HILLS AREA <br />1 <br />2021.501 <br />MOBILIZATION <br />LUMP SUM <br />1 <br />$5,000.00 <br />$5,000.00 <br />2 <br />2104.505 <br />REMOVE CONCRETE DRIVEWAY PAVEMENT <br />SO YD <br />150 <br />$6.00 <br />$900.00 <br />3 <br />2104.505 <br />REMOVE BITUMINOUS DRIVEWAY PAVEMENT <br />SO YD <br />200 <br />$4.00 <br />$800.00 <br />4 <br />2105.501 <br />COMMON EXCAVATION <br />CU YD <br />100 <br />$20.00 <br />$2,000.00 <br />5 <br />2105.507 <br />SUBGRADE EXCAVATION (EV) <br />CU YD <br />300 <br />$20.00 <br />$6,000.00 <br />6 <br />2211.503 <br />AGGREGATE BASE CLASS 5 <br />CU YD <br />500 <br />$30.00 <br />$15,000.00 <br />7 <br />2331.604 <br />BITUMINOUS PAVEMENT RECLAMATION (FULL DEPTH) <br />SQ YD <br />12910 <br />$1.50 <br />$19,365.00 <br />8 <br />2360.501 <br />TYPE SP 9.5 WEARING COURSE (2,C) (SPWEA240C) (2360) <br />TON <br />1120 <br />$75.00 <br />$84,000.00 <br />9 <br />2360.501 <br />TYPE SP 12.5 NON -WEARING COURSE (2,B) (SPNWB240B) (2360) <br />TON <br />1490 <br />$70.00 <br />$104,300.00 <br />10 <br />2360.503 <br />TYPE SP 9.5 WEARING COURSE MIXTURE (2,B) 3.0" THICK <br />SO YD <br />200 <br />$30.00 <br />$6,000.00 <br />11 <br />2501.601 <br />DRAINAGE IMPROVEMENTS AND REPAIR PIPE CULVERT <br />LUMP SUM <br />1 <br />$3,000.00 <br />$3,000.00 <br />12 <br />2506.522 <br />ADJUST FRAME & RING CASTING <br />EACH <br />4 <br />$400.00 <br />$1,600.00 <br />13 <br />2531.507 <br />6" CONCRETE DRIVEWAY PAVEMENT <br />SO YD <br />150 <br />$52.00 <br />$7,800.00 <br />14 <br />2535.501 <br />MONOLITHIC BITUMINOUS CURB (6" HEIGHT) <br />LIN FT <br />7600 <br />$8.00 <br />$60,800.00 <br />15 <br />2563.601 <br />TRAFFIC CONTROL <br />LUMP SUM <br />1 <br />$5,000.00 <br />$5,000.00 <br />16 <br />2573.530 <br />STORM DRAIN INLET PROTECTION <br />EACH <br />5 <br />$150.00 <br />$750.00 <br />17 <br />2582.502 <br />24" SOLID LINE WHITE -EPDXY <br />LIN FT <br />18 <br />$10.00 <br />$180.00 <br />18 <br />2582.503 <br />CROSSWALK MARKING -EPDXY <br />SOFT <br />144 <br />$6.00 <br />$864.00 <br />TOTAL COST ELK HILLS IMPROVEMENTS: <br />$323,359.00 <br />