OWNER: <br />PROJ: <br />LOC.: <br />• <br />City of Ramsey <br />Ramsey Fire Station 2 Replacement <br />Ramsey, Minnesota <br />BKV <br />GROUP <br />PROJ#_: <br />FILE# • <br />31 -Jul -06 <br />07 -Jul -09 <br />1572 <br />Concept Estimate - Option 3 <br />NEW SQ FT <br />REMODEL SQ FT <br />9,776. <br />0 <br />New Construction <br />AREA TO REMAIN <br />0 <br />acres 5 <br />TOTAL SQ FT <br />9,776 <br />COST/ <br />BUILDING <br />COST <br />SUB <br />PERCEN <br />DESCRIPTION <br />BUILDING <br />SF <br />SF <br />TOTAL <br />TOTA <br />ADMINISTRATION <br />9,776 <br />$0.97 <br />$9,500 <br />0.39% <br />LEGAL, FISCAL & ADMINISTRATIVE <br />$0 <br />0.00% <br />SOIL BORINGS <br />$8,000 <br />0.33%'; <br />SURVEY <br />$1,500 <br />0.06% <br />CONSTRUCTION COSTS <br />9,776 <br />$182.25 <br />$1,781,640 <br />73.99% <br />Building Demolition - Existing City Hall, Fire Station, Police SI <br />$143,000 <br />5.94% <br />Existing Site Repair (topography only, no fill) <br />$20,000 <br />0.83% <br />New Site Costs <br />$250,000 <br />10.38% <br />New Construction <br />$1,368,640 <br />56.84%', <br />FEES <br />9,776 <br />$19.52 <br />$190,862 <br />7.93% <br />A/E DESIGN AND BIDDING FEES <br />$143,171 <br />5.95%' <br />CIVIL ENGINEERING <br />$14,000 <br />0.58%I <br />LANDSCAPE ARCHITECTURE <br />$8,000 <br />0.33% <br />REIMBURSABLE EXPENSES <br />$7,874 <br />0.33% <br />PLAN REVIEW FEES & PERMITS <br />$4,454 <br />0.18% <br />SPECIAL INSPECTIONS AND TESTING <br />$13,362 <br />0.55%I <br />FURNISHINGS, FIXTURES & EQUIPMENT (FF&E) <br />9,776 <br />$10.63 <br />$103,905 <br />4.31% <br />OFFICE FURNITURE ALLOWANCE' <br />$78,208 <br />3.25%1 <br />KITCHEN EQUIPMENT ALLOWANCE" <br />$10,000 <br />0.42% <br />LAUNDRY EQUIPMENT ALLOWANCE <br />$8,000 <br />0.33% <br />FF&E DESIGN FEES <br />$7,697 <br />0.32%I <br />TECHNOLOGY <br />9,776 <br />$0.62 <br />$8,000 <br />0.33% <br />DATA /TELEPHONE <br />$8,000 <br />0.33%I <br />SURVEILLANCE CAMERAS / MONITORS <br />$0 <br />0.00%!, <br />CONTINGENCY <br />9,776 <br />$32.13 <br />$314,086 <br />13.04% <br />ESTIMATING (5%) <br />$104,695 <br />4.35%'. <br />PROJECT (10%) <br />$209,391 <br />8.70% <br />I <br />FINANCING <br />9,776 <br />$0.00 <br />$0 <br />0.00% <br />BOND ISSUANCE COSTS <br />• $0 <br />0.60% <br />INVESTMENT EARNINGS <br />$0 <br />0.00%� <br />TOTAL <br />9,776 <br />S246.32 <br />S2,407,993 <br />100.00% <br />Project Cost Escalation <br />To Assumed Project Year 2010 <br />Grand Total - 2007 <br />Grand Total - 2008 <br />Grand Total - 2009 <br />Grand Total - 2010 <br />Escallation Beyond Currently Anticipated Project Schedule <br />Grand Total - 2011 <br />Grand Total - 2012 <br />Grand Total - 2013 <br />Grand Total - 2014 <br />Grand Total - 2015 <br />8% Inflation <br />6% Inflation <br />1% Inflation <br />4% Inflation <br />4% Inflation <br />4% Inflation <br />5% Inflation <br />5% Inflation <br />5% Inflation <br />NOTE: BONDING COSTS SHOULD BE DETERMINED BY COUNTY'S BONDING CONSULTANT <br />$2,600,632 <br />$2,756,670 <br />$2,784,237 <br />$2,895,606 <br />$3,011,430 <br />$3,131,888 <br />$3,288,482 <br />$3,452,906 <br />$3,625,551 <br />NOTE: ESTIMATE ASSUMES TRADITIONAL GENERAL CONTRACTOR BIDDING, CONSTRUCTION MANAGER FEES ARE NOT INCLUDED. <br />NOTE: DISPATCH EQUIPMENT INSTALLATION COSTS DO NOT INCLUDE POTENTIAL RF TOWER EQUIPMENT UPGRADES <br />NOTE: EXISTING SCBA, LAUNDRY/EXTRACTOR, AND GEAR RACKING EQUIPMENT TO BE RE -USED <br />Page 1 <br />