OWNER: <br />PROJ: <br />LOC.: <br />. <br />City of Ramsey <br />Ramsey Fire Station 2 Replacement <br />Ramsey, Minnesota <br />r: II P <br />PROJ# : <br />• <br />31 -Jul -06 <br />07 -Jul -09 <br />1572 <br />Conce.tEstimate -O•tion3 <br />EW SQ FT <br />REMODEL SQ FT <br />10,85 <br />_ 0_ <br />New Construction <br />AREA TO REMAIN <br />0 <br />acres 5 <br />TOTAL SQ FT <br />10 854 <br />COST/ BUILDING <br />COST <br />SUB <br />PERCENT <br />DESCRIPTION <br />BUILDING SF <br />SF <br />TOTAL <br />TOT. <br />ADMINISTRATION <br />10,854 <br />$0.88 <br />$9,500 <br />0.36% <br />LEGAL, FISCAL & ADMINISTRATIVE <br />$0 <br />0.00%', <br />SOIL BORINGS <br />$8,000 <br />0.31% <br />SURVEY <br />$1,500 <br />0.06% <br />CONSTRUCTION COSTS <br />10,854 <br />$178.05 <br />$1,932,560 <br />74.08% <br />Building Demolition - Existing City Hall, Fire Station, Police SI <br />$143,000 <br />5.48% <br />Existing Site Repair (topography only, no fill) <br />$20,000 <br />0.77% <br />New Site Costs <br />$250,000 +d <br />9.58% <br />New Construction <br />$1,519,560 V <br />58.25% <br />FEES <br />10,854 <br />$18.90 <br />5205,109 <br />7.86% <br />A/E DESIGN AND BIDDING FEES <br />$155,245 <br />5.95% <br />CIVIL ENGINEERING <br />$14,000 <br />0.54% <br />LANDSCAPE ARCHITECTURE <br />$8,000 <br />0.31% <br />REIMBURSABLE EXPENSES <br />$8,538 <br />0.33% <br />PLAN REVIEW FEES & PERMITS <br />$4,831 <br />0.19% <br />SPECIAL INSPECTIONS AND TESTING <br />$14,494 <br />0.56%I <br />FURNISHINGS, FIXTURES & EQUIPMENT (FF&E) <br />10,854 <br />$10.43 <br />$113,219 <br />4.34% <br />OFFICE FURNITURE ALLOWANCE* <br />$86,832 <br />3.33% <br />KITCHEN EQUIPMENT ALLOWANCE" <br />$10,000 <br />0.38% <br />LAUNDRY EQUIPMENT ALLOWANCE <br />$8,000 <br />0.31% <br />FF&E DESIGN FEES <br />$8,387 <br />0.32% <br />TECHNOLOGY <br />10,854 <br />$0.74 <br />$8,000 <br />0.31% <br />DATA / TELEPHONE <br />$8,000 <br />0.31%',, <br />SURVEILLANCE CAMERAS ! MONITORS <br />$0 <br />0.00% <br />CONTINGENCY <br />10,854 <br />$31.35 <br />$340,258 <br />13.04% <br />ESTIMATING (5%) <br />$113,419 <br />4.35% <br />PROJECT (10%) <br />$226,839 <br />8.70% <br />FINANCING <br />10,854 <br />$0.00 <br />$0 <br />0.00% <br />BOND ISSUANCE COSTS <br />$0 <br />0.00% <br />INVESTMENT EARNINGS <br />$0 <br />0.00% <br />TOTAL <br />10,854 <br />$240.34 <br />$2,608,646 <br />100.00% <br />Project Cost Escalation <br />To Assumed Project Year 2010 <br />Grand Total - 2007 <br />Grand Total - 2008 <br />Grand Total - 2009 <br />Grand Total - 2010 <br />Escalladon Beyond Currently Anticipated Project Schedule <br />Grand Total - 2011 <br />Grand Total - 2012 <br />Grand Total - 2013 <br />Grand Total - 2014 <br />Grand Total - 2016 <br />8% Inflation <br />6% Inflation <br />1% Inflation <br />4% Inflation <br />4% Inflation <br />4% Inflation <br />5% Inflation <br />5% Inflation <br />5% Inflation <br />NOTE: BONDING COSTS SHOULD BE DETERMINED BY COUNTY'S BONDING CONSULTANT <br />$2,817,337 <br />$2,986,377 <br />$3,016,241 <br />$3,136,891 <br />$3,262,366 <br />$3,392,861 <br />$3,662,504 <br />$3,740,629 <br />$3,927,661 <br />NOTE: ESTIMATE ASSUMES TRAD[T1ONAL GENERAL CONTRACTOR BIDDING, CONSTRUCTION MANAGER FEES ARE NOT INCLUDED. <br />NOTE: DISPATCH EQUIPMENT INSTALLATION COSTS DO NOT INCLUDE POTENTIAL RF TOWER EQUIPMENT UPGRADES <br />NOTE: EXISTING SCBA, LAUNDRY/EXTRACTOR, AND GEAR RACKING EQUIPMENT TO BE RE -USED <br />Page 1 <br />