Laserfiche WebLink
OWNER: <br />PROJ: <br />LOC.: <br />TITLE: <br />City of Ramsey <br />Ramsey Fire Station 2 Replacement <br />Ramsey, Minnesota <br />PRELIMINARY CONCEPTUAL ESTIMATE <br />DATE: 31 -Jul -06 <br />REV#: <br />PROJ#_: <br />FILE# <br />1572 <br />BKV <br />Concept Estimate - Option 3 <br />NEW SQ FT <br />REMODEL SQ FT <br />9,776 <br />0 <br />New Construction <br />AREA TO REMAIN <br />0 <br />acres 5 <br />TOTAL SQ FT <br />9,776 <br />COST/ <br />BUILDING <br />COST <br />SUB <br />PERCENT <br />DESCRIPTION <br />BUILDING <br />SF <br />SF <br />TOTAL <br />TOTAL <br />ADMINISTRATION <br />9,776 <br />$0.97 <br />$9,500 <br />0.39% <br />LEGAL, FISCAL & ADMINISTRATIVE <br />$0 <br />. <br />0.00% <br />SOIL BORINGS <br />$8,000 <br />0.33% <br />✓SURVEY <br />$1,500 <br />0.06% <br />CONSTRUCTION COSTS <br />9,776 <br />$182.25 <br />$1,781,640 <br />73.99% <br />Building Demolition - Existing City Hall, Fire Station, Police S $143,000 <br />5.94% <br />Existing Site Repair (topography only, no fill) <br />$20,000 <br />0.83% <br />✓New Site Costs <br />$250,000 <br />10.38% <br />✓New Construction <br />$1,368,640 <br />56.84% <br />FEES <br />9,776 <br />$19.52 <br />$190,862 <br />7.93% <br />NE DESIGN AND BIDDING FEES <br />$143,171 <br />5.95% <br />CIVIL ENGINEERING <br />$14,000 <br />0.58% <br />LANDSCAPE ARCHITECTURE <br />$8,000 <br />0.33% <br />REIMBURSABLE EXPENSES <br />$7,874 <br />0.33% <br />PLAN REVIEW FEES & PERMITS <br />$4,454 <br />0.18% <br />SPECIAL INSPECTIONS AND TESTING <br />$13,362 <br />0.55% <br />FURNISHINGS, FIXTURES & EQUIPMENT (FF&E) <br />9,776 <br />$10.63 <br />$103,905 <br />4.31% <br />OFFICE FURNITURE ALLOWANCE* <br />$78,208 <br />3.25% <br />KITCHEN EQUIPMENT ALLOWANCE** <br />$10,000 <br />0.42% <br />LAUNDRY EQUIPMENT ALLOWANCE <br />$8,000 <br />0.33% <br />FF&E DESIGN FEES <br />$7,697 <br />0.32% <br />TECHNOLOGY <br />9,776 <br />$0.82 <br />$8,000 <br />0.33% <br />DATA / TELEPHONE <br />$8,000 <br />0.33% <br />SURVEILLANCE CAMERAS / MONITORS <br />$0 <br />0.00% <br />CONTINGENCY <br />9,776 <br />$32.13 <br />$314,086 <br />13.04% <br />ESTIMATING (5%) <br />$104,695 <br />4.35% <br />PROJECT (10%) <br />$209,391 <br />8.70% <br />FINANCING <br />9,776 <br />$0.00 <br />$0 <br />0.00% <br />BOND ISSUANCE COSTS <br />$0 <br />0.00% <br />INVESTMENT EARNINGS <br />$0 <br />0.00% <br />TOTAL <br />9,776 <br />$246.32 <br />$2,407,993 <br />100.00% <br />NOTE: BONDING COSTS SHOULD BE DETERMINED BY COUNTY'S BONDING CONSULTANT <br />NOTE: ESTIMATE ASSUMES TRADITIONAL GENERAL CONTRACTOR BIDDING, CONSTRUCTION MANAGER FEES ARE NOT <br />INCLUDED. <br />NOTE: DISPATCH EQUIPMENT INSTALLATION COSTS DO NOT INCLUDE POTENTIAL RF TOWER EQUIPMENT UPGRADES <br />NOTE: EXISTING SCBA, LAUNDRY/EXTRACTOR, AND GEAR RACKING EQUIPMENT TO BE RE -USED <br />Page 1 <br />