My WebLink
|
Help
|
About
|
Sign Out
Home
08/07/84
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Planning and Zoning
>
Agendas
>
1980's
>
1984
>
08/07/84
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2025 3:51:56 PM
Creation date
2/24/2004 3:06:45 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Document Title
Planning and Zoning Commission
Document Date
08/07/1984
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
151
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br />I <br />I <br />I <br />I <br />! <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />I <br />I <br />I <br /> <br /> i. Er~,sion Control. Wind and water erosion will be <br />controlled b~ the dily cover and compaction of refuse and the <br />utilization ~f correct soil materials for interim cover and final <br />cover in °rd~r to provide appropriate vegetation. Upon the final <br />closure ~f a~y portion of the site, such final vegetation will be <br />in place.-~ iShort term wind erosion control is accomplished <br />through the se of watering tanks, all-weather access roads and <br /> <br />the use o~ s nthetic dust reducers. (June 25, 1984 testimony of <br />Henry Koeh~: ~lan~,. Sect±ohs III.F, VIII, and IXl Conditional ~se <br />Permit.) <br /> iWa~er and Methane Monitorin~ Programs. Monitoring <br />programS ilWil~ be maintained both to monitor ground water to <br />assure ~h~ c~ntinued integrity of the leachate collection system <br /> , <br />and to ~e~ec~ the migration, if any, of methane gas that will <br />require ~he !use of a methane control system. (June 25, 1984 <br />TestimonY.of Henry Koch; Plans, Sections VII and X; Conditional <br />Use Per t.)I <br /> <br /> ~ ~e~tor~ .- Control. Flies, rats and other vectors will be <br />controlledl b~ the use of compaction equipment and the daily <br />covering-~f ~efuse at the landfill site. A professional pest <br />control Service will inspect the site on a monthly basis to <br />insure prope~ control and take appropriate action, if necessary. <br />(June 25, :19~4 Testimony of Henry Cook; Plans, Section III.H; <br />Conditional ~se Permit.) <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.