Laserfiche WebLink
I <br />I <br />I <br />I <br />I <br />! <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />I <br />I <br />I <br /> <br /> i. Er~,sion Control. Wind and water erosion will be <br />controlled b~ the dily cover and compaction of refuse and the <br />utilization ~f correct soil materials for interim cover and final <br />cover in °rd~r to provide appropriate vegetation. Upon the final <br />closure ~f a~y portion of the site, such final vegetation will be <br />in place.-~ iShort term wind erosion control is accomplished <br />through the se of watering tanks, all-weather access roads and <br /> <br />the use o~ s nthetic dust reducers. (June 25, 1984 testimony of <br />Henry Koeh~: ~lan~,. Sect±ohs III.F, VIII, and IXl Conditional ~se <br />Permit.) <br /> iWa~er and Methane Monitorin~ Programs. Monitoring <br />programS ilWil~ be maintained both to monitor ground water to <br />assure ~h~ c~ntinued integrity of the leachate collection system <br /> , <br />and to ~e~ec~ the migration, if any, of methane gas that will <br />require ~he !use of a methane control system. (June 25, 1984 <br />TestimonY.of Henry Koch; Plans, Sections VII and X; Conditional <br />Use Per t.)I <br /> <br /> ~ ~e~tor~ .- Control. Flies, rats and other vectors will be <br />controlledl b~ the use of compaction equipment and the daily <br />covering-~f ~efuse at the landfill site. A professional pest <br />control Service will inspect the site on a monthly basis to <br />insure prope~ control and take appropriate action, if necessary. <br />(June 25, :19~4 Testimony of Henry Cook; Plans, Section III.H; <br />Conditional ~se Permit.) <br /> <br /> <br />