My WebLink
|
Help
|
About
|
Sign Out
Home
08/07/84
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Planning and Zoning
>
Agendas
>
1980's
>
1984
>
08/07/84
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2025 3:51:56 PM
Creation date
2/24/2004 3:06:45 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Document Title
Planning and Zoning Commission
Document Date
08/07/1984
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
151
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> <br /> I <br /> I <br /> I <br />,I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> <br /> Fi e Control The possibility of fire at the landfill <br />is reduC~d b~ daily co~er and the use of earth materials. In the <br />unlikely event of fire, earth materials are stockpiled in active <br />areas in thetevent of its need for extinguishing fires and a site <br />water tankt Bulldozer and scraper are available for immediate <br />response; ii E~ch piece of equipment, as well as buildings on the <br />site, wil~ ~ave fire control equipment and site personnel are <br />routinely p~ovided instruction in firefighting procedures. <br />(June 25,!~19~4 Testimony of Henry Koch; Plans, Sections III.B and <br /> <br /> i. Cl~sure and Post-Closure Care. At such time as the <br />landfill ~s iclosed, Waste Management w±ll continue an active <br />closure a~d ~ost-closure progra~ which includes routine ~nspec- <br />tions, m~n~nance, revegetation, if necessary, erosion control, <br />removal O~ l~achate, and continued monitoring to assure that the <br />facility is: ~erforming as it should. (June 25, 1984 Testimony of <br />Henry K°~h; !Plans, Sections IX, XI and XII. County of Anoka <br />Solid W~ iOrdinance,~i.~ 73-1, 82-1, 83-2 and 83-3, Sect±on V, <br />subsecti0~s ~ and 6 provide comprehensive requirements for a 5 <br />year cloSUre iand a 20 year post-closure period.) <br /> <br /> 18. - ~h~ North 80. Except as discussed below, the same <br />construction [and operating criteria set forth with respect to <br />South 70 ~pp!y to the North 80 and the Commission draws the same <br />conclusions ~ith respect to said items. The approximately 25 <br />acre faci~it~ to be placed on the North 80 is an extension of and <br />an integ~&l ~art of the current Anoka/Ramsey Landfill. The North <br />80 envir°~me~tal improvement will extend over onto the current <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.