My WebLink
|
Help
|
About
|
Sign Out
Home
08/07/84
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Planning and Zoning
>
Agendas
>
1980's
>
1984
>
08/07/84
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2025 3:51:56 PM
Creation date
2/24/2004 3:06:45 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Document Title
Planning and Zoning Commission
Document Date
08/07/1984
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
151
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br />I <br />i <br />I <br />I <br /> <br /> = g~thered concurrent with the preparation of the lis. Re applicant <br /> s tlndtcated that the technical data necessary for the preparation of <br /> ~15 will be available 60 days prior to the completion of the draft <br />m <br /> EIS cr approximately May 15, [983. <br /> <br /> &( consisting representatives of the City <br /> ~m~ h~c <br /> technical <br /> task <br /> force <br /> f ~ en Prairie, the applicant and other affected local and state agen- <br /> ~C~eS will be utilized to assist tn developing and reviewing the various <br /> :e))~,..nts of the EIS doc~ent. The ~tropolitan Waste Ma~ag~ent Advisory <br /> ~C~~ ttee of the ~tropolttan Council will review the draft and final <br /> ~pPto~ to their release by the Council. <br /> <br /> ~LE DAR <br /> <br /> ~ EIS preparation notice for this project must be published in the EQB <br /> '~Cor no later th~n 45 calendar days after the scoping decision is <br /> !~ssu ~ Within the following 280 days, a draft and a final EIS must be <br /> rep~,red and released for public ~view and the Council must make a <br /> et~ination of adequacy for the finalm EIS. The key dates in this <br /> ro~ <br /> ~ss are as roll.s. ~e expected schedule is s~ewhat fasteW than <br /> {h~ allo"ed under EQB rules. <br /> ~PECT~D FLYING CLOUD ~NITARY ~NDFILL ~P~SION EIS TIM~ABLE <br /> <br /> o Ub~)it EIS preparation notice .to EQB <br /> nltor on or before <br /> <br /> lSiprepcration notice .in £QB Monito~ <br /> n er before <br /> <br /> iDat~ by which all technical data for <br /> ;[pro~ect will be provided by applicant <br /> <br /> iDraft ElS released <br /> <br />;.Pub~lication of draft ElS availability <br />' ~not!ice in EQB l~nitor <br /> <br /> Public hearing on draft EIS <br /> i Coniment period closes <br /> i Fir~al ElS released <br /> <br /> : Put[licatior~ of final EIS availability <br /> ~' nol:ice in EQB Monitor <br /> <br /> Me;ropolitan Council final determine- <br /> r tt )n of adequacy (according to EOB <br /> 'rules, this is ~ue by Jan. 7, 1984) <br /> <br />April 4, 1983 <br /> <br />April 11, 1983 <br />May 15, I983 <br /> <br />July 14, 1983 <br /> <br />Aug. I, 1983 <br /> <br />Aug. 17, 1923 <br /> <br />Sept. 1, 1983 <br /> <br />Sept. 22, 1983 <br /> <br />Oct. lO, 1983 <br /> <br />Oct. 27, 1983 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.