My WebLink
|
Help
|
About
|
Sign Out
Home
08/07/84
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Planning and Zoning
>
Agendas
>
1980's
>
1984
>
08/07/84
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2025 3:51:56 PM
Creation date
2/24/2004 3:06:45 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Document Title
Planning and Zoning Commission
Document Date
08/07/1984
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
151
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
erosiomco$~rol, dust, l~ter, and n~se plans on ~uly 28; <br />closure; uX~Zmace l~d use, and post clos~e monZtorZnE ~lans <br /> <br />Re u: r d C m onen~s of an A llca~lon lor ~CA Solid <br /> <br />It is n:~ ~le~ whether BFI/Woodl~e s submittals to ~he Metropol!ta~ <br />Co~ci!:~fo~ ~he EIS will be developed to the degree of detail needed <br />for ~n~C$ pe~mt ~o ~he e~ansion. Consequently, it is no~ possi. <br />ble at~hi~ ~e ~o dete~ne if ~he 90 d~y provision In 6 MC~ <br />3.031:B~l,~wlll apply. ~ ~he ~CA Board is to m~e ~ decision on <br />pe~it ~ss~nce within 90 days ~fter the dete~ination o~ adoqu~cy <br />o~ the~ EISa, ~he pe~ ~pplicmtion m~t be developed concu~ently <br />with ~h~ E~S, ~nd mos~ o~ the ~ppl~c~tlon mus~ be ~vmil~ble ~or ~e- <br /> <br />~CA '~i~l ~equlre BFI/Woodl~e's pe~t applics~ion Zo con~n es- <br />sen~i~l!y ~he s~e work elements ~nd level o~ detail as we h,ve <br />requi~ i~ ~he J~nu~y 28 ~endod pe~t for the existing l~d~il!. <br />Some o~f~ e~sting l~ill's pe~t requirements call ~or the <br />ev~lu~on~of impacts from ~he l~ill; for ~hese ite~, BFI/Wood!~ <br />shoUl~ ~os~ logically develop ~n i~acZ ~ssessment for ~he <br />concu~n~ly wi2h ~he i~c~ s~udy ~hey ~re doing for the existing <br />sl~e. ~h~s ~ssessmen2 should s~ with the i~mc~s from t~ ex- <br />isting ~i~l, then use the s~e metho~ to dete~ine the ad~itiOn~! <br />lmpac~S~ ~om the e~slon. ~e potential problem with ~s ~p- <br />pro~c~ ~:is~again ~he existing pekin's due da~es. ~e existing <br />sl~e ~t ~nalysis, the s~ing point for e~ansion imp~c~ <br />evml~o~, does not h~ve ~o be submi2~ed to the ~CA un~il M~y 28. <br /> ~or ~ le~t ~wo re~ons, the 90 day requirement for ~ decision <br /> Pe~ :~ls~ce could be dif~icult for ~CA. First, o~ pe~it <br /> ~ft!~g,~30 day cogent period, pe~it revisions, prep~stion <br /> a BO~d l~em', ~nd ~d decision would cons~e the lion's shoe <br /> ~he 95~d~ period, leaving lit~le t~e for staf~ review and possi- <br /> ble re~ub~ittal o~ s~e it~ by the ~pplicant. Second, we are <br /> uncer~in ~when we will h~ve a pe~ ~pplication ~hat we reg~d <br /> "co~!~e~'' since we do not know either ~he level of detail o~ ~he <br /> submit]~l$~ . BFI/Woodl~e.will be providing, to you. ~or the EIS or <br /> when ~Mese submit~als wmll be avamlable and ~xn~l. Consequently, <br /> ~hat the ~CA Solid Waste not be identified <br /> re~nd <br /> pe~t <br /> a pe~t ~or which info~ation will be gathered conc~rently with <br /> EIS pf~pa~mtion, pursusnt to 6 MCAR 3.030E.l.c., ~less BFI/Woodl~e <br /> ~Ke· A co~itment to provide the ~CA with ~ pe~it <br /> s~eci1.c <br /> <br />I <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.