Laserfiche WebLink
TABLE I <br /> <br />ESTIMATED COSTS - CENTRAL PARK <br /> <br />A. Contracted Costs: <br /> <br />1. Grading <br />2. Gravel Base <br />3. Bituminous Parking & Driveway <br />4. Topsoil* <br />5. Seeding, Fertilizing & Mulching <br />6. Ag-Lime <br /> <br />Total Construction <br />Engineering & Administrative <br /> <br />Total Contracted Costs - <br /> <br /> $25,ooo.oo <br /> 4,200.00 <br /> 9,~5oo.oo <br /> 7,500.O0 <br /> 3,200.00 <br />.. §,?oo.oo <br />i$5 6oo.oo <br /> <br /> $6~,!000.00 <br /> <br />B. Materials Costs: <br /> <br />1. Benches <br />2. Fence <br />3. Backstops <br /> <br />Total Materials - <br /> <br />Total Project Cost <br /> <br />Annual Cost (10 Year)** <br /> <br /> TABLE I I <br /> <br />COST SUMMARY <br /> <br /> $400.00 <br /> 800. O0 <br /> ,6oo. oo <br /> <br />$3,8oo.oo <br /> <br />~ $69,800.00 <br /> $12,354.60 <br /> <br />! <br />! <br /> <br /> * Optional <br /> <br />** Based on 12 percent interest. <br /> <br /> <br />