Laserfiche WebLink
Mr. Jeffrey Roos, P.E. <br />June 12, t992 <br />Page 2 of 3 <br /> <br />.} <br /> <br />MSA Street: The project will require the construction of approximately 1,150 feet of <br />MSA street. The street shall be constructed ,40 feet in width with B618 concrete curb and <br />gutter. The mad shall be built to nine-ton design standards. <br /> <br />BASIC ENGINEERING SERVICES <br />Please provide a cost for the following basic engineering services on a not-to-exceed basis. Also <br />provide an estimate of the number of man hours required to provide these services. <br /> <br />Review preliminary plat plans and modify as may be required to ensure adequate <br />design standards. <br />Prepare cost estimate for construction cost. <br />Prepare plans, specification and contract documents. <br />Prepare exhibits and submittals necessary to secure approval form the lower Rum <br />River Water Management Organization. <br />Submit application and supporting information to secure dewatering permits for <br />construction dewatering. <br />Submit application and supporting information to secure DNR permits for storm <br />discharges into protected wetlands. <br />Secure regulatory agency review approvals of the plans and specifications. <br />Approvals will be required from Metropolitan Waste Control Commission, <br />Department of Health and Metropolitan Council. <br />Submit plans and necessary supporting information to secure MnDOT approval for <br />the construction of Sunfish Lake Boulevard N.W. as an MSA roadway. Contract <br />documents should be formatted to allow a separate award of the MSA road project <br />since MnDOT approval will likely occur after the construction of the underground <br />utilities are desired to have commenced. <br />Submit information required by the Anoka County I-Iigbway Department to secure a <br />permit for access to County Road #5. The County has been contacted and has <br />submitted comments on this preliminary plat. The County Highway Department <br />will require submission of documentation verifying that runoff to the ditch line <br />adjacent to the County Road will not exceed the pre-development conditions. <br />Solicit bids from qualified contractors by preparing notification for the City legal <br />newspaper and trade magazine. <br />Attend bid opening, tabulate bids received and prepare recommendation for City <br />Council on award. <br />Conduct pre-construction conference and attend meetings as required for the <br />satisfactory progression of the project. <br />Submit necessary reports and reimbursement requests to obtain the disbursements <br />of MSA construction funds for that segment of the project. <br />Conduct project site visits by the engineer in charge to insure satisfactory progress <br />and compliance with specifications. <br />Prepare change orders and review and approve contractor pay requests. <br />Make interpretation of plans and specifications. <br />Prepare as-built plans. <br /> <br /> <br />