Laserfiche WebLink
February 28, !992 <br /> <br />Robert Torldi , <br />TKDA EngSg~rsll .~. chitects Planners <br />2500 Ameri~ai~. Na~onal Bank Building <br />St. Paul, lvfbl 155i91 <br />Request fOt,~En~ineering Proposal <br />Dear Mr. T~e: <br /> <br />Because of <br />an offer to <br />construcU.'onia. <br />lots. The <br />layout and a <br />having a <br />am supplying! <br />Project Desl <br /> <br /> Sanit.aTM <br /> ranging~r <br /> Road i#Si. <br /> The world, <br /> on three iai <br /> Attachm~n <br /> <br />for Wood Pond Hills Subdivision <br /> <br />ar frg'm s past ~nterest in providing services for the City of Ramsey, I hereby extend <br />mig ~ngineering proposals on the above referenced project. The project entails the <br />! :t14~ infrastructure associated with the development of 48 single family residential <br />ir~ I~roject layout and locatxon ~s dlustrated ~n Attachment A. A prehm~nary plat <br />~ plan has been prepared. The level of detail for these plans include a base map <br />sonic with two foot contour intervals. To assist you in preparing your proposal, I <br />he f~llowing description of project components: <br />irip~ion <br />.~we~:' The construction consists of 30" and 15" diameter trunk lines at depths <br />m 2~ to 34 feet. The interceptor sewer terminates with a jacking under County <br />['he [soils consist of medium to f'me sands and dewatering can be anticipated. <br />aowbver, will not involve wetland construction. Also included are lateral lines <br />reet~ having minimum depth installation. The sewer layout is illustrated in <br />:B2: The estimated construction cost of the sanitary sewer is $164,000. <br /> <br /> Watermak~: Tlte project includes construction of approximately 3,700 feet of 12" trunk <br /> waterm ~_~.'. knd't,050 feet of 6" lateral watermain. The locations of the mains are identified <br /> on Atta¢l~e~ ~. Also, the construction will include hydrants, fittings and 48 residential <br /> cost of the $139,000. <br /> construction <br /> ~timated <br /> serviCes, ~ee watermain is <br /> <br /> · i <br /> Storm Sa?er: IThe construction of a local storm water collection sewer will need to <br /> conform i t{} l~al topography. The preliminary grading and drainage plan has been <br /> preparedi lJut ~es not detail pipe sizes. For the purposes of your proposal, estimate the <br /> cost of st° ~l~tn ~wer to be $50,000. <br /> ' <br /> Residenti~ Streets: Construction of three residential streets shall be to 7 ton design <br /> stand~a~d 3~ feet in width. The estimated cost for the design of these residential streets <br /> is $68,0'00~.~ <br /> <br /> MSA Streets: '~he project will also entail the construction of Sunfish Lake Drive which will <br /> be an M~ s~e~et constructed with a 40 foot width and a 9 ton design. The street will be <br /> approxima, t~lyi[~,200 feet long and will.terminate prior to reaching the wetland at its western <br /> terminuS, q~he"~stimated construction cost of the MSA road is $45,000. <br />Basic Engineering Services <br />Please pr°Vid~ aniestimate of man hours and a not to exceed cost for the following basic <br />engineering s~rf~rice~: <br /> : <br /> <br /> <br />