Laserfiche WebLink
Mr. Stcven J. Jankowski, P.E. <br />March 5, 1992 <br />Page 2 <br /> <br />POST CONSTRUCTION SERVIC.E_S <br /> <br />Our scope of services will include preparation of "Record Drawings," <br />preparation of submittals and documentation necessary to secure MSA <br />funding reimbursements, and identification of final project costs attributable <br />to classification identified in feasibility report. <br /> <br />Estimated man-hours required = 64 hours; not-to-exceed $3,500.00. <br /> <br />Construction inspection and staking services would be provided on an hourly <br />basis. The estimated number of man-hours for construction inspection is <br />estimated to be 450 man-hours assuming a 10-week construction period. Our <br />hourly rate for construction inspection services is $50.00 per hour. The <br />estimated number of crew hours for construction staking is estimated to be <br />110 hours. This estimate does not include locating the horizontal control and <br />thc front lot corners. Our hourly rate for a 2-man survey crew is $80.00 per <br />hour. <br /> <br />RCM has the man power and resources to begin the work immediately. We <br />are excited about the opportunity to work with you on this project and want <br />to thank you for your consideration. <br /> <br />Sincerely, <br /> <br />RIF,.[KE CARROLL MULLER ASSOCIATES, INC. <br /> <br />Peter .I. Carlson, P.E. <br />Project Manager <br /> <br />Wa/lly~J~hnson, P E <br />Client Services <br /> <br />PJC:jj <br /> <br /> <br />