Laserfiche WebLink
rieke <br />carroll <br />muller <br />associates, inc. <br />enaineers <br />arEnitects <br />land surveyors <br /> <br />equal opportunity <br />employer <br /> <br />~lvlar ;h 5, 1992 <br /> <br />! r <br />/Mr, ~teven J. Jankowski, P.E. <br />~Cit~ Engineer <br />f~it~ of Ramsey <br />i15153 Nowthen Blvd. N.W. <br />~Ramsey, MN 55303 <br />? <br /> <br />R£:: Engineering Services for <br />~ ~ Wood Pond Hills Subdivision <br />i i' Ramsey, Minnesota <br /> <br />Z)ca? Steve: <br /> ~re pleased to submit this proposal to provide engineering services for the <br />)tre/~t and utility improvements for Wood Pond Hills Subdivision. It is our <br />!understanding that a preliminary plat and grading plan has been approved <br />!and!would be available for our use. Our proposed scope of services, estimated <br />~an~ hours and a not-to-exceed cost for these engineering services are as <br />Ifollgws: <br /> <br />:~Or,fECT F£AS[BI'I..,fTY STUDY <br />~hc[Study,will identify utility needs and construction and project costs, sewer <br />ndiwater utiIity costs attributable to these improvements, identify additional <br />coati to upgrade street and drainage improvements of Sunfish Lake Drive to <br />~ standards, and identify significant non-construction related project <br />~ost~ and provide funding policy recommendations. <br /> <br /> ' Estimated man-hours required = 60 man-hours; not-to-exceed $3,000.00. <br /> <br />~Ouri.seope of work wall include provadmg plans, specifications and bid <br />~oet~ments, submitting plans to appropriate agencies for permits, providing a <br />ide~liled cost estimate and probable construction schedule, distributing <br />[con//truction documents during bidding phase, answering prebid questions, <br />~attending bid opening and preparing a bid tabulation. <br /> <br /> Estimated man-hours required = 350 hourS; not-to-exceed $17,500.00. <br /> <br />I_CO] ISTRUCTION ADMINISTRATIQN <br /> <br />IOur scope of work will include general contract administration, preparation <br />!0f ~hange orders, review and approval of pay estimates and interpretations of <br />~p aas and specifications. <br /> <br /> ~ Our estimated man-hours assumes a lO-week construction period <br /> ' Estimated man-hours required = 150 hours; not-to-exceed $9,750.00. <br /> <br />10901 red circle drive <br />box 130 <br />m~nnetonka, minnesota 553~3 <br />612-935-6901 ,, <br /> <br /> [ <br /> <br /> <br />