My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 03/24/1992
Ramsey
>
Public
>
Agendas
>
Council
>
1992
>
Agenda - Council - 03/24/1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2025 4:20:45 PM
Creation date
2/25/2004 3:00:09 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
03/24/1992
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
143
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Steven J. Jankowski, P.E. <br />March 5, 1992 <br />Page 2 <br /> <br />POST CONSTRUCTION SERVICES <br /> <br />Our scope of services will include preparation of 'Record Drawings,~ <br />preparation of submittals and documentation necessary to secure MSA <br />funding reimbursements, and identification of final project costs attributable <br />to classification identified in feasibility report. <br /> <br />Estimated man-hours required -: 64 hours; not-to-exceed $3,500.00. <br /> <br />Construction inspection and staking services would be provided on an hourly <br />basis. The estimated number of man-hours for construction inspection is <br />estimated to be 450 man-hours assuming a I0-week construction period. Our <br />hourly rate for construction inspection services is $50.00 per hour. The <br />estimated number of crew hours for construction staking is estimated to be <br />110 hours. This estimate does not include locating the horizontal control and <br />the front lot corners. Our hourly rate for a 2-man survey crew is $80.00 per <br />hour. <br /> <br />RCM has the man power and resources to begin the work immediately. We <br />are excited about the opportunity to work with you on this project and want <br />to thank you for your consideration. <br /> <br />Sincerely, <br /> <br />iit ~MULLER ASSOCIATES, INC. <br />pRelt~. Carlson, P.E. <br />Project Manager <br /> <br />Client Services <br /> <br />?JC:jj <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.