My WebLink
|
Help
|
About
|
Sign Out
Home
08/11/92
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Budget Committee
>
Agendas
>
1992
>
08/11/92
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2025 8:58:58 AM
Creation date
2/26/2004 9:37:05 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Document Title
Budget Committee
Document Date
08/11/1992
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, <br /> <br />Garage DoorS: [ <br /> West:! ~o~ existing (three at 12' x 12') and (one at 12' x 14' tall) <br /> : ~v~d~ future openings would allow 11' x 12' tall <br /> <br /> East: ~ix ~x~stmg (five at 12 x 12) and (one at 12 x 14 tall) <br /> ~hr4e future openings would allow (two at 12' x 12') and (one at 12' x 14' tall) <br />Note: All exl~tmgidoors are in need of repair or replacement. <br />Estimated eosD; of ~'epairing and/or replacing overhead doors with safety edge automatic door <br />openers: $23,~00~i <br /> <br />Demolition: , <br />1) ~emove interior partition walls in shop areas. <br />2) ~en~ove interior partition walls in east end office area, west building. <br />3) !Ren~ove interior office/storage room west end, west building. <br />4) ,~,ire~ contractor to supply dumpsters and dispose of demolition material. <br /> <br />Estimated eostiof d~molition and disposal: $7,500.00 <br /> <br />Electrical: [ <br />1) 40°~ of ceiling light fixtures (fluorescent) need replacing. <br /> 2) ~][nSt~ll 110 and 220 volt receptacles and G.F.I. receptacles as needed for <br /> ic, on~ liance; of local, State and Federal electrical building codes. <br />Note: ElectriCal iff west building, including lighting, seems sufficient. <br /> <br />Estimated cO$~of electrical upgrading: $10,000.00. <br /> <br />Heating and A~ ~ditioning: <br /> Wes(~ildi~ng: Sub-floor electrical coil heating system seems sufficient with L.P. forced <br /> air au~liar~ system. I spoke with present tenants and they seemed comfortable with <br /> existing system. Also, central air condenser units are made by Rheem and are suitable for <br /> comme rei use. <br /> <br /> East b~iildi~g: Overhead L.P. gas infrared system may or may not need upgrading but <br /> should ~e checked out by a qualified heating and air conditioning technician. <br /> <br />Estimated cos(of-~h~ating and air conditioning upgrading: $10,000.00 <br />Plumbing: i <br /> West t~ild~ng: Two existing bathrooms and one kitchen area should be removed and all <br /> water ~upp~y lines and sewage or waste lines should be plugged or capped. The two <br /> rcnmt .~n~ gl~athrooms and kitchen will be utilized. <br /> East b~ildi~g: No restroom facility in operation at present time. I would recommend <br /> hooking, u~both facilities to City water and sanitary sewer systems. Restroom facility in <br /> east building could be added at a later date if necessary. <br /> <br />Estimated cos~ of l~lumbing, sewer and water fipgrading: $20,000.00 <br /> <br />Excavating, and ?aving: <br /> <br /> Estimated ¢ost of above: $50,000.00. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.