Laserfiche WebLink
Estimated cost,of ~oving current Public Works building to new site and setting up on top. of raised <br />foundation (il~r0flimately 5 feet) for ceiling clearance of larger trucks being serviced on shop <br />hoists. <br /> <br />Note: Cost W~uld ~fiect the following items: <br /> I) ~i~onnect fees for utilities. <br /> 2) ~raa.'ing and transportation of building. <br /> 3) IReqbired permits. <br /> 4) iEx¢t~vafing and grading. <br /> 5) )::ouhdation and floor with drains and shop hoists installed. <br /> 6) [Pl~ment and anchoring of building. <br /> 7) [U~l!,ty reconnecfion fees and inspections. <br /> 8) !ReVisions to existing overhead doors for accommodation of new openings. <br />Estimated eost~ for ~bove: $50,000.00 <br />Salt and sand ~toratge shed: $25,000.00 <br /> Appro:lima~e size: 40' x 60' x 18' side walls. <br /> <br />Est/mated Cos~ for ~xterior repairs of buildings: $5,000.00. <br /> <br />Estimated cos[ for ppgrading air cOmpressors, lines, regulators, etc.: $5,000.00. <br />Estimated co~t foi~overhead grease and oil rack, service area and miscellaneous upgrading and <br />modernizing ~pe0ses: $10,000.00. <br /> <br />Soil boring te~ng ~expenses are unknown at this time. <br /> <br /> ~ ~ Total Estimated Cost Summary <br />I i <br />1~ Demolition <br />2~ ~O~erhead doors and operators <br /> <br /> Plfimbing <br /> 5)r H~afing and air conditioning <br />6~ Salt and sand storage shed <br /> 7): Ai~' compressors, lines, regulators - upgrading <br /> '8! F_~.efior repairs and cosmetic improvements <br />19~0I Re moval and transportation of current Public Works shop <br /> E~ gavafing, grading and paving <br />11) MJ scellaneous expenses <br /> <br />$ 7,500.00 <br />$ 23.400.00 <br />$ 10,000.00 <br />$ 20,000.00 <br />$ 10,000.00 <br />$ 25,000.00 <br />$ 5,000.00 <br />$ 5,000.00 <br />$ 50,000.00 <br />$ 50,000.00 <br />$ I0.000.00 <br />$215,900.00 <br /> <br /> <br />