My WebLink
|
Help
|
About
|
Sign Out
Home
03/11/92
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Economic Development Commission
>
Agendas
>
1992
>
03/11/92
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2025 2:25:05 PM
Creation date
2/26/2004 11:27:05 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Document Title
Economic Development Commission
Document Date
03/11/1992
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Economic Development Potential <br /> <br />The City of Ramsey offers a unique development opportunity in a difficull and challenging <br />Iocational setting. Capturing economic expansion requires an equally unique, organized and <br />progressive program lo remove Iocational limitations. The implemenling actions summarized <br />here are extracted from the report. They overlap other recommendations because of the <br />interrelationships of land use, market, financing, transportation, design and organization. <br /> <br />Implementation is a system of actions and interrelationships as well. Each aclion has a <br />resulting reaction. Underlaking seleclive portions musl be caretuliy weighed as to the impact <br />on achieving results without olher complementary implementation actions. <br /> <br />or <br /> <br />Establish a high Drofi!e identitv broc~ram. <br /> <br />o Name induslrial and commercial districls <br />o Establish graphic and signing image Monument Entrance Signs <br /> <br />o Develop promolional programs Annual Business EXPO, Ramsey Video <br />o Consider renaming the city <br /> <br />(This action has many facets. An.,,, program must go beyond the cosmelics of slogans and <br />graphics. The identity program should back up the structural changes. Elemenls include <br />community signing, private sign controls, building design, landscape treatment, public <br />building design, community awards, promotional brochures, events and testivals, etc. <br />Establishment of an identity package for TH 10 and the induslrial district would include <br />names, signage, organizational activities, promotional activities, etc.) <br /> <br />~rgpare inventory and directory of existino bgsiness¢s. <br /> <br />Prepare lis~ of e×istino land ownershio. List of Existing Vacant Commercial <br /> <br />Completed with Corresponding Map <br /> <br />AOODI a preliminary industrial area developmenl plan based on 1he findings and <br /> <br />recommendations of this plannin9 effort. <br /> <br />o Consolidated and coordinated industrial park <br /> <br />o Improved circulation syslem with major cenlral entrance <br /> <br />o Coordinated connection with Thurston <br /> <br />o Segmented industrial developmenl districts <br /> <br />o Overall design controls <br /> <br />o Phased e×lension of urban services <br /> <br />o Coordinated signing <br /> <br />Draft 48 2/6/92 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.