My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Parks and Recreation Commission - 06/11/1992
Ramsey
>
Public
>
Agendas
>
Parks and Recreation Commission
>
1992
>
Agenda - Parks and Recreation Commission - 06/11/1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2025 11:20:06 AM
Creation date
2/26/2004 2:04:33 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Parks and Recreation Commission
Document Date
06/11/1992
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10. Street Lights. After consultation with Anoka <br /> Electric Cooperative or other provider of <br /> electrical services, the City Engineer shall <br /> place within the development agreement, a <br /> street light construction plan which will then <br /> be constructed as a Stage I Improvement, the <br /> cost of purchase, installation and two year's <br /> operation and maintenance thereof being <br /> included within the development agreement <br /> as a Stage I Improvement. <br /> <br />Stage II Improvements. <br /> <br />1. Street Striping And Signing. Upon completion of the <br /> street, the owner or developer shall install all street signs and <br /> traffic signs as required by the City Engineer. Street striping <br /> shall be completed on all major thoroughfares, commercial and <br /> indus~al streets as required by the City Engineer. Striping shall <br /> be completed after sealcoating is done. <br /> <br />2. Street Sweeping. Following the completion of all <br /> construction, the developer or subdivider shall sweep the streets. <br /> <br />3. Sidewalk. In areas as required by the City Council, the <br /> developer or subdivider shall install sidewalk in accordance with <br /> plans and specifications approved by the City Engineer. <br /> <br />4. Sealeoating. Within two years after the construction of the <br /> streets, the developer or subdivider shall sealcoat the streets in <br /> accordance with City specifications. The time schedule on <br /> sealcoating may be extended by the City if less than 50% of the <br /> lots within the Subdivision have been developed. <br /> <br />5. Adjusting Water Shut-Off Boxes. The water shut-off <br /> boxes shall be adjusted at the time the final boulevard grade is <br /> established. The water shut-off boxes shall remain visible after <br /> the boulevard sod is installed. <br /> <br />6. Boulevard Sodding. This item shall be completed just prior <br /> ~o occupancy of the building. This item may be completed <br /> sooner provided the developer or subdivider maintain the sod <br /> until the dwelling or structure is occupied. <br /> <br />7. Maintenance of Storm Water Sewer and Facilities. <br /> Upon completion of all work within a subdivision, including the <br /> sodding, the developer or subdivider shall clean all storm water <br /> sewers. The developer or subdivider shall also remove silt from <br /> all ponding areas which received runoff from the development <br /> property. <br /> <br />Escrow of Required Deposits. All sums deposited with the City <br />in accordance with this section shall be kept in separate funds which <br />funds shall be encumbered and earmarked for the later consm~cfion of <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.