My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Parks and Recreation Commission - 06/11/1992
Ramsey
>
Public
>
Agendas
>
Parks and Recreation Commission
>
1992
>
Agenda - Parks and Recreation Commission - 06/11/1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2025 11:20:06 AM
Creation date
2/26/2004 2:04:33 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Parks and Recreation Commission
Document Date
06/11/1992
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stflxlivision - Desil Standards <br /> <br />5. Water, Water mains and service connections stubbed in to the <br /> property line shall be installed to serve ail lots in the Subdivision <br /> when the location of such plat is within an area of the City which <br /> is either being assessed for water service or within which <br /> contracts for such service have been awarded by the Council. <br /> The Council, in its discretion, may waive the application of this <br /> portion of the ordinance upon a showing that to require the <br /> installation of water mains within the Subdivision would not be <br /> feasible with regard to the extension of existing trunk mains to <br /> service the Subdivision or that the particular locations or unusual <br /> circumstances of the proposed plat would cause undue hardship <br /> to either the owner or subdivider or the City. <br /> <br />6. Street Traffic Control Signals. If deemed necessary by <br /> the City Engineer and City Council, the owner or subdivider <br /> shall install street traffic control signals. The signalization shall <br /> be constructed in conjunction with the street unless the City <br /> Council grants a waiver to delay signalization. In the event such <br /> waiver is granted, the owner or subdivider shall deposit with the <br /> City a sum of money equivalent to the Engineer's estimated cost <br /> of the signalization. <br /> <br />7. Easement Acquisition. Prior to the time of construction, the <br /> owner or subdivider shall obtain all easements required for the <br /> project. At the time the project is complete and turned over to <br /> the City, all easements shall be deeded to the City. In the event <br /> the subdivider requires easements outside his plat, he may <br /> request the City to take over that portion of the project and <br /> construct the project as a City project. <br /> <br />8. Lot Grading. Ail lots shall be graded in accordance with the <br /> final grading plan. In addition, erosion control measures shall <br /> be followed to eliminate erosion. Upon completion of the <br /> grading, topsoil shall be restored and temporary vegetation <br /> established. <br /> <br />Park and Trail Development. As part of the <br />development agreement, the Park and <br />Recreation commission shall establish a park <br />and trail development plan prior to recording <br />of the plat and entering into the development <br />agreement, The City Engineer shall provide a <br />feasibility study for completion of this park <br />and trail development estimating the cost of <br />said development, This development shall <br />then be completed as a Stage I Improvement, <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.