Laserfiche WebLink
9.50.56 <br />subsurface <br />The locafion~d <br /> <br />9.50.57 <br />required by th~C <br />gravel base~.O <br />placed in th{: pul <br />designateZl by ~he <br /> <br />§ 9.50.30 <br /> <br />ibsurface conditions. The subdivider shall cause tests to be made of <br />[fns to determine the nature and extent of subsurface soil, rock and water. <br />'~Sults of said tests shall be made available to the City. <br /> <br />Ii, walks and pedestrian ways. All sidewalks and pedestrian ways <br />Y shall be constructed of a four inch concrete placed on a four inch (4") <br />ies shall be as approved by the City Engineer. Sidewalks shall be <br />ic right-of-way one foot from the property line and shall be a width <br />.~ity. <br /> <br />Construction definition of trail ways. <br /> <br />All trall~al!$ shall be constructed of a two inch (2") <br />bltuml,n°~I mat on a two inch (2") gravel base. Grades <br />shall be !al i approved by the City Engineer. All paved <br />trailwaY$!~[rtlall be of an eight foot (8') width with two <br />foot (2')"~lr~ded shoulders. <br />9.50.~85 9i Public utilities. <br /> <br /> !StI] division 1. In all residential zoned subdivisions, all telephone, <br />electric and'§al~ si vice lines shall be placed underground within dedicated public ways or <br />recorded eai;~e~ i in such manner as not to conflict with other underground services. All <br />undergroun¢~iris, raj ~tion of service lines within street right-of-ways shall be completed in a <br />manner whlah~w! i not disturb street surfacing. Upon completion of the installation of <br />undergroundis~a,vi e lines in dedicated public ways, a tracing and two copies of plans and <br />specifications s~ho~., ing the completed installation shall be filed with the Zoning Officer. <br /> iSu~d. 2. All utility poles, except those providing street lighting, shall be <br />placed in rear 10t lithe easements where feasible. <br /> i~uib~d. 3. Alt underground utility service lines, including water, drainage <br />and sanitarY S~w~r~ systems which traverse private property, shall be installed within <br />recorded ea~e~en~i <br />9.50.~960 ~ iiI Trunk storm drainage assessments. In all drainage districts <br />in which the C{ iy ~as installed or is in the process of installing trunk drainage facilities, any <br />SubdivisiOn Or i:¢~bdivision of any lot or parcel will not be permitted until the subdivider <br />pays or agr~s to l~fiY the trunk storm drainage charge. The amount of the storm drainage <br />charge shall}~ th~iCity's cost of the storm drainage improvement plus an increased amount <br />of inflationarY ',cO,,S~;s as determined by the Construction Cost Index. The initial storm <br />drainage impro ;'¢~[nt charge shall be set by a separate City Council resolution for each of <br />the City's drain t~g~ districts. <br /> · <br /> <br /> <br />