My WebLink
|
Help
|
About
|
Sign Out
Home
09/01/92
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Planning and Zoning
>
Agendas
>
1990's
>
1992
>
09/01/92
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2025 2:56:36 PM
Creation date
3/1/2004 11:12:06 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Document Title
Planning & Zoning Commission
Document Date
09/01/1992
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
14. <br /> <br />Waste Oil. All waste oil shall be collected for recycling in accordance with Anoka <br />County and MPCA regulations. <br /> <br />15. <br /> <br />Oil Residues on Paved Surfaces. The Permit Holder shall store all feedstock <br />material with oil residues within leakproof containers so as to minimize potential <br />stormwater runoff contamination. <br /> <br />16. <br /> <br />Outside Storage of Materials and Equipment. The outside storage of inoperable <br />vehicles and equipment shall not be permitted. <br /> <br />17. <br /> <br />Trailer/Vehicle Storage. The use of trailers, trucks or vehicles for long-term storage <br />(longer than 30 consecutive days) is prohibited. All vehicles and trailers on site must bear a <br />current license, be registered, and must be road worthy. <br /> <br />18. <br /> <br />Hazardous Wastes. No hazardous wastes, as defined by the U.S. Environmental <br />Protection Agency or Minnesota Pollution Control Agency (MPCA), shall be burned at the <br />facility. No defined hazardous wastes shall be stored or handled at the facility unless the <br />required permits have been obtained from Anoka County Environmental Services and the <br />City has been provided a copy of same. <br /> <br />19. <br /> <br />Ash. All ash from the site shall be removed from the site on a regular basis, shall not be <br />stockpiled in excess of 35 tons on the property, shall be stored inside a building and shall <br />be processed by a lawful processor or deposited in an U.S. Environmental Protection <br />Agency approved landfitl. All ash residue shall be removed from the site in a covered, <br />contained load. <br /> <br />20. <br /> <br />Ash DisposaL. Permit Holder shall provide the City with a copy of the written agreement <br />or certification from the designated ash processing and/or disposal facility that said facility <br />is willing to accept the ash. The Permit Holder shall notify the City of any change in ash <br />processing/disposal facilities within 30 days of such change. <br /> <br />21. <br /> <br />Wire Processing. The Permit Holder shall not process wire by melt operations on the <br />Site. <br /> <br />22. <br /> <br />Control of Operations. All hauling, processing, separating, disposal and other <br />activities incidental to the aluminum processing operation shall be conducted in <br />conformance with state and federal regulations and in accordance with the applicable <br />requirements of the Performance Standards of the City Code. Operations must be <br />conducted so as to minimize noise, safety, smoke or other nuisance concerns to adjacent <br />properties. <br /> <br />23. <br /> <br />Pest Control. Insects and rodents on the site shall be controlled and exterminated as <br />needed and additional control may be directed by the City Inspector subject to all applicable <br />laws, roles and regulations. <br /> <br />24. <br /> <br />Litter Control. Danny's Aluminum Processing, Inc. shall be responsible for removing <br />debris caused by vehicles using the aluminum processing facility. Debris removal activities <br />shall be instituted promptly following information of such accumulation. In the event the <br />Permit Holder fails to remove debris within 24 hours of notice of accumulation by the City, <br />the City may cause such debris to be removed. The City shall bill the cost of such removal <br />to the Permit Holder and payment shall be remitted within 30 days of the date of such <br />billing. Visual checks for debris accumulation shall be made at least once daily by <br />employees of the Permit Holder. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.