My WebLink
|
Help
|
About
|
Sign Out
Home
11/05/92
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Planning and Zoning
>
Agendas
>
1990's
>
1992
>
11/05/92
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/15/2025 4:06:53 PM
Creation date
3/1/2004 11:26:28 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Document Title
Planning & Zoning Commission
Document Date
11/05/1992
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Council grants a waiver to delay signalization. In the event such <br />waiver is granted, the owner or subdivider shall deposit with the <br />City a sum of money equivalent to the Engineer's estimated cost <br />of the signalization. <br /> <br />Easement Acquisition. Prior to the time of construction, the <br />owner or subdivider shall obtain all easements required for the <br />project. At the time the project is complete and turned over to <br />the City, all easements shall be deeded to the City. <br /> <br />Lot Grading. All lots shall be graded in accordance with the <br />final grading plan. In addition, erosion control measures shall <br />be followed to eliminate erosion. Upon completion of the <br />grading, topsoil shall be restored and temporary vegetation <br />established. <br /> <br />Park and Trail Development. The Park and Recreation <br />commission shall establish a park and trail development plan <br />prior to recording of the plat and entering into the development <br />agreement. The City Engineer shall provide a feasibility study <br />for completion of this park and trail development estimating the <br />cost of said development. This development shall then be <br />completed as a Stage I Improvement. <br /> <br />10. <br /> <br />Street Lights. After consultation with Anoka Electric <br />Cooperative or other provider of electrical services, the City <br />Engineer shall place within the development agreement, a street <br />light construction plan which will then be constructed as a Stage <br />I Improvement, the cost of purchase, installation and three <br />year's operation and maintenance thereof being included within <br />the development agreement as a Stage I Improvement. <br /> <br />Stage II Improvements. <br /> <br />Street Striping And Signing. Upon completion of the <br />street, the owner or developer shall install all street signs and <br />traffic signs as required by the City Engineer. Street striping <br />shall be completed on all major thoroughfares, commercial and <br />industrial streets as required by the City Engineer. Striping shall <br />be completed after sealcoating is done. <br /> <br />Street Sweeping. Following the completion of all <br />construction, the developer or subdivider shall sweep the streets. <br /> <br />Sidewalk. In areas as required by the City Council, the <br />developer or subdivider shall install sidewalk in accordance with <br />plans and specifications approved by the City Engineer. <br /> <br />Seaicoating. Within two years after the construction of the <br />streets, the developer or subdivider shall sealcoat the streets in <br />accordance with City specifications. The time schedule on <br />sealcoating may be extended by the City if less than 50% of the <br />lots within the Subdivision have been developed. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.