Laserfiche WebLink
Appendix A —Ordinances <br />Updated Storm Water Management Plan (SWMP) <br />City of Ramsey, Minnesota <br />Establish d by Ord. #75 08, Juno 27, 1975. <br />Ord. #85 02 r placod Chapter in wh lo. Effoctivo <br />August 12, 1985. <br />incr acing th plane d width f a riv r trail c rrid r fr m <br />established until funds become available. Also amended <br />§9.21.07 Subd. 1.a, changing th ar a standard f r 1 is <br />located in the Critical River Area and Urban Service Area <br />from 10,000 sq. ft. to 20,000 sq. 11. for riparian lots with <br />public sewer in r sidontial districts, fr m 20,000 sq. ft. t <br />residential districts, and from 125 foot lot width at <br />building lin and riv r fr ntag t 90 f t in r sid ntial <br />districts. Effective March 19, 1989. <br />Ord. 1190 02 r placod §9.21.05 Subd. 1 in wh le, <br />detailing specific standards for trail right of way widths. <br />Effective February 26, 1990. <br />Appendix A <br />February 20, 2015March 6, 2015 Page 29 <br />