Laserfiche WebLink
Key Personnel <br />Ross Tillman, P.E. will assist Bryan in completing the analysis efforts. He is experienced in <br />traffic forecasting using multiple methodologies including ITE trip generation manuals and the <br />Metropolitan Council Model. He is also well versed in ITE trip generation and traffic operations <br />and simulation analysis using Synchro, SimTraffic, CORSIM, VISTRO, and VISSIM, along with <br />HCS. He will be involved in the analysis, developing recommendations and writing the formal <br />report. He has completed traffic studies for cities, counties, and MnDOT. He will also direct <br />field data collection efforts that will be essential in evaluating existing conditions and correctly <br />calibrating models. <br />Jason Cook, P.E. will assist Kevin Kielb in preparation of the Feasibility Report. Mr. Cook is a <br />Project Engineer with experience in municipal engineering. Since beginning his career in 2004, <br />he has gained a wide range of experience in project administration from conception through <br />construction. His background includes development and design of municipal reconstruction <br />projects, including street construction, sanitary sewer systems, water distribution systems, storm <br />water collection systems and pedestrian facility construction. His administrative duties have <br />included preliminary engineering reports, preliminary and final design cost estimates, attendance <br />at city council meetings, bidding assistance and construction administration. In addition, Mr. Cook <br />has assisted in training young E.LT.'s on proper construction observation skills and is an expert in <br />water system modeling. <br />Future Business Park RFQ I City of Ramsey, Minnesota 10 <br />