Laserfiche WebLink
Non -Council Wastewater Treatment Plants <br />There are 15 wastewater treatment plants in the metro area that are municipally owned and <br />operated (See Table 2). The Council plans to provide regional service as follows: <br />1. Rogers is a suburban community which owns and operates its own wastewater <br />treatment plant. It is expected that Rogers will request that the Council acquire its <br />wastewater treatment plant as the City continues to grow. <br />2. Loretto will be served by the Blue Lake Plant via the Maple Plain Interceptor by 2020, <br />based on state regulatory requirements, i.e. elimination of their discharge as part of <br />implementing the Total Maximum Daily Load for Lake Independence. <br />3. The Council has a wastewater treatment plant acquisition agreement with the City of <br />New Germany. <br />Table 2. Municipal Wastewater Treatment Plants <br />Treatment <br />Plant <br />Design Design Receiving Water Effluent <br />Capacity, Capacity, Limits (2) <br />gpd (1) gpd (1) Avg. <br />Avg. Wet Dry <br />Weather Weather <br />Belle Plaine <br />Bethel <br />Cologne <br />Greenfield <br />840,000 <br />37,500 <br />325,000 <br />100,000 <br />400,000 <br />31,000 <br />260,000(4) <br />80,000(4) <br />Minnesota River <br />Ground Water <br />Ditch to Lake Benton <br />Crow River <br />B, P. S <br />B, S <br />B, P, S <br />B, P, S <br />Hamburg 63,000 50,400(4) <br />Ditch to Bevens Creek B, S <br />(to Minnesota) <br />Hampton <br />101,000 80,800 Ditch to Vermillion River B, S <br />Jordan <br />1,289,000 580,000 Sand Creek (to <br />Minnesota) <br />B, N, P, S <br />Loretto 61,000 48,800(4) Slough to Spurzem B, P, S <br />Creek <br />Mayer (3) 435,000 320„000 Crow River <br />New Germany 52,000 41,600(4) Crow River <br />B, N, P, S <br />B, S <br />Norwood - <br />Young <br />America <br />908,000 <br />517,000 Ditch to Bevens Creek B, S <br />(to Minnesota) <br />Rogers <br />St. Francis <br />Vermillion <br />Watertown <br />1,602,000 1,103,000 <br />540,000 432,000(4) <br />54,000 43,200(4) <br />1,200,000 800,000 <br />Ditch to Crow River <br />Ground Water <br />Ditch to Vermillion River <br />Crow River <br />B, P, S <br />B, N, P, S <br />B, S <br />B, N, S <br />Notes: 1. Flow as stated in NPDES Permits, except as described in note 4 <br />2. Effluent Limits: <br />B = Biochemical Oxygen Demand <br />N = Ammonia Nitrogen <br />P = Phosphorus <br />S = Suspended Solids <br />3. Expansion proposed <br />4. Average flow estimated, based on maximum month flow times 0.8 <br />