Laserfiche WebLink
Long -Term Wastewater Service Area <br />Concept Plan <br />The wastewater system plan includes a specific plan to serve the region's projected 2040 <br />growth and a general plan to serve the region's growth far beyond 2040. The wastewater <br />system plan has a longer planning horizon than local comprehensive plans because sewers <br />have a long useful life. <br />The Council is updating the Twin Cities metro area Master Water Supply Plan to address the <br />sustainability of water supply in the region, and has identified areas where groundwater aquifers <br />may not have sufficient capacity to support long-term sewered development. The Regional <br />Wastewater System Plan's long-term wastewater service area (Appendix F) is premised on <br />successful development and implementation of sustainable water supply to support planned <br />sewered development. The Council defines the long-term wastewater service areas based on: <br />• The capacity of each treatment plant site, <br />• The potential developable surface area that could be served by the plant, in addition to <br />currently served areas, and <br />• Using appropriate wastewater generation rates based on location, proximity to transit <br />and major highways, and physical features of area. <br />The developable area excludes lakes, rivers, wetlands, steep slopes, major highways, and <br />parks. The area effectively available for future development is further reduced in areas where <br />there are other significant natural resources or locations requiring more areas devoted to <br />stormwater management, such as trout stream watersheds and/or tight soils (making infiltration <br />of stormwater more difficult). <br />For long-term wastewater service areas, communities shall address the staging of sewered <br />development through 2040 as well as protection of the remaining long-term service areas for <br />economical future sewered development in their local comprehensive plan updates, surface <br />water management plans, and water supply plans. The regional wastewater system will be <br />expanded as necessary to facilitate development in communities consistent with their approved <br />comprehensive sewer plans. <br />The long-term wastewater service area includes large "potential wastewater service areas" in <br />Dakota and Scott Counties. The objective of this designation is to ensure low enough <br />development density to enable future economical sewered development and preserve land for <br />continued agricultural uses. In Carver County, the Council and the County have a memorandum <br />of understanding whereby the County preserves low density in its agricultural area, consistent <br />with the region's potential need for additional area for sewered development. <br />Long -Term Service Area of Existing Treatment Plants <br />Blue Lake. Previously wastewater service to Loretto, northwest Medina, and southwest <br />Corcoran was planned through the Elm Creek Interceptor. The revised plan is to serve this area <br />from the Blue Lake Plant via Maple Plain and the downstream interceptor system. <br />Metropolitan. Three areas (northeast Andover, southeast Nowthen, and northeast Ramsey) <br />have previously been identified as study areas for potential future wastewater service. These <br />34 <br />