My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 12/20/1983
Ramsey
>
Public
>
Agendas
>
Council
>
1983
>
Agenda - Council - 12/20/1983
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2025 12:04:50 PM
Creation date
3/22/2004 9:28:19 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
12/20/1983
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
390
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br /> I <br /> I <br /> I <br /> I <br /> I <br /> <br />Mr. Jack Ippel <br /> <br />-4- <br /> <br />December 13, 1983 <br /> <br />PHASE I I <br /> <br />ll. Airport Zonin9 <br /> <br />$6,500.00 <br /> <br />A. Prepare Imaginary Surface Plan <br />B. Prepare Land Use Safety Zone Plan <br />C. Prepare Zoning Ordinance <br />D. Coordinate with City and Reviewing Agencies <br />E. Public Hearing (one meeting) <br /> <br />TOTAL COST OF PHASE II - <br /> <br />$6,500.OO <br /> <br />SUMMARY: <br /> <br />Total <br /> <br />State Share <br /> <br />City Share <br /> <br />Phase Ia $29~900.00 <br />Phase Ib $4,000.00 <br /> <br />$23,920.00 $5,980.00 <br />$3,200.00 $800.00 <br /> <br /> Phase II $6,500.00 <br /> <br />Total Engineering <br />Cost - $40,400.00 <br /> <br />$5,200.00 $1,300.00 <br /> <br />$32,320.00 $8,080.00 <br /> <br />Phase Ia and II are not-to-exceed amounts except for Item 5A. where the Aerial <br />Topography could increase by $1,050.00 if a more recent topography is required. <br /> <br />Phase Ib, Public Participation is proposed to be completed on a time and <br />materials basis allowing for hearing preparation, attendance at hearings and <br />material costs for audio and visual display. This work will run concurrent <br />with Phase Ia. <br /> <br />There could be some reduction in the cost of the AMP should the commission <br />members themselves volunteer to do research and/or compile data required for <br />the plap study. <br /> <br />The value of this work is difficult to measure at this time wi'thout detail <br />discussion with the members. It is proposed that should the study be funded, <br />we could meet with the commission on a regular basis to discuss the plan and <br />seek advice and guidance in developing the final AMP. <br /> <br />The proposed schedule of events suggests that it would take six to eight (6-8) <br />months to complete the draft AMP. <br /> <br />m <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.