My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 03/24/2015
Ramsey
>
Public
>
Agendas
>
Council
>
2015
>
Agenda - Council - 03/24/2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 4:02:53 PM
Creation date
3/25/2015 10:18:25 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
03/24/2015
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
556
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. EXECUTIVE SUMMARY <br />Division B of City Improvement Project 15-00 proposes to complete bituminous pavement <br />overlay improvements to numerous public street segments within the City of Ramsey, including <br />other associated appurtenant improvements as outlined in this report. Approximately 494,000 square <br />feet of public streets in several areas of the City are proposed to receive overlay improvements. <br />Appendix A includes an overall project location map, as well as four exhibits showing the individual <br />project areas. <br />City staff typically rates the pavement sections of all city streets on an annual basis using the <br />Pavement and Surface Evaluation Rating (PASER) system. The latest PASER rating for each <br />street segment proposed to receive an overlay with this project is included in the street segments <br />summary found in Appendix B. <br />On February 10th, 2015 the Ramsey City Council ordered this feasibility report which explores <br />the need, scope, costs, funding sources, and proposed schedule for the project. <br />The engineer's opinion of probable costs for this project is $634,880. Estimated costs include <br />10% contingency costs plus 25% indirect costs for administrative, engineering, and legal costs. <br />The improvements proposed with this project are identified in the City's current 5 -year Capital <br />Improvement Plan, and can be funded using a combination of Street Reconstruction Plan Bond <br />funds, special assessments to benefiting properties, and utility enterprise funds. Appendix C <br />includes a preliminary assessment roll and map. <br />The proposed improvements are necessary, feasible, and cost-effective from an engineering <br />standpoint, and can be constructed as proposed herein. <br />Feasibility Report <br />2015 Street Maintenance Program, Division B: Overlay Improvements <br />City of Ramsey Project No. 15-00 <br />Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.