My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 03/24/2015
Ramsey
>
Public
>
Agendas
>
Council
>
2015
>
Agenda - Council - 03/24/2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 4:02:53 PM
Creation date
3/25/2015 10:18:25 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
03/24/2015
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
556
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. INTRODUCTION <br />2.1 Authorization <br />Preparation of this feasibility report was authorized by the Ramsey City Council on February <br />10th, 2015. <br />2.2 Program Overview <br />This project is designated as Division B of the 2015 Street Maintenance Program; Improvement <br />Project No. 15-00. <br />Division A of the 2015 Street Maintenance Program is proposed to include all crack seal and seal <br />coat projects, and will be bid separately in the spring of 2015. In the future, all proposed street <br />reconstruction projects will be included as Division C of each annual Street Maintenance <br />Program. But due to the recent adoption of the Special Assessments Policy, the proposed street <br />reconstruction project for 2015 will be completed as a separate improvement project since it was <br />already in progress at the time the assessment policy was adopted. <br />This feasibility report explores proposed overlay improvements to approximately 494,000 square <br />feet of public streets within several areas of the City. The street segments are proposed to receive <br />11/2" bituminous overlays with edge milling along curbs. Associated appurtenant improvements are <br />also proposed to be completed as necessary and as outlined in this report. <br />Maps showing the location of the proposed improvements are included in Appendix A. <br />2.3 Scope <br />The scope of this report addresses proposed overlay improvements to approximately 310,000 <br />square feet of public streets within several areas of the City as shown in Appendix A. <br />Feasibility Report <br />2015 Street Maintenance Program, Division B: Overlay Improvements <br />City of Ramsey Project No. 15-00 <br />Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.