Laserfiche WebLink
TABLE I <br />FRONT STREET N.W. <br />ESTIMATED COSTS <br /> <br />Construction Costs <br /> <br />Construction Overhead (30%) <br />Total Estimated Construction Cost with Overhead: <br />Right-of-Way Costs <br />Total Estimated Street Project Cost: <br /> <br />City Council <br />Public Hearing <br />April 26, 1988 <br />Attachment A <br />Page 1 of 3 <br /> <br />Street <br /> <br />$312,450.00 <br /> <br />93,750.00 <br />$406t200.00 <br />168,500.00 <br />$580,000.00 <br /> <br /> TABLE II <br />STORM SEWER CONSTRUCTION <br /> ESTIMATED COSTS <br /> <br />A. Front Street Storm Sewer Extensions: <br /> <br /> Construction Cost $ 13,000 <br /> Construction Overhead (30%) 3,900 <br /> Total Estimated Cost $ 16,900 <br /> <br />~ i~<~' - B~ ~¥':'Ri~id~'~~ ~torm""Sewer Extensions :' <br /> <br />Construction Cost <br />Construction Overhead (30%) <br />Total Estimated Cost <br /> <br />Hamilton/Holasek Storm Sewer Lateral <br /> <br />$ 11,800 <br /> 3,600 <br />$15,400 <br /> <br />Construction Cost <br />Construction Overhead (30%) <br />Total Estimated Cost <br /> <br />$ 22,500 <br /> 6~800 <br />$ 29,300 <br /> <br />D. Sunfish Lake Blvd. Trunk Storm Sewer <br /> <br />Construction Cost <br />Construction Overhead (30%) <br />Total Estimated Cost <br /> <br />$ 71,300 <br /> 21t400 <br />$ 92,700 <br /> <br />E. Total Estimated Storm Sewer Costs: <br /> <br />$154,300 <br /> <br /> <br />