My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 02/10/2015
Ramsey
>
Public
>
Agendas
>
Council
>
2015
>
Agenda - Council - 02/10/2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:59:46 PM
Creation date
5/14/2015 2:43:51 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
02/10/2015
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
881
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
for ZAYO to terminate any such Lateral Connections to access the County Dark Fibers, and <br />install, splice, maintain, repair and replace the County Dark Fibers therein. <br />6.3 Route Design. County acknowledges that, for portions of the System Route on <br />which construction has not begun, if any, as of the Effective Date of this Agreement, deviations <br />in the Zayo System Route or County Route, including material deviations from the Estimated <br />Route Miles, are possible. ZAYO shall take into consideration any of County's input, interest <br />and concerns with respect to material changes in the route design of the Initial Service Order. <br />7. Testing and Acceptance of County Dark Fibers <br />7.1 Fiber Acceptance Testing. ZAYO shall test the County Dark Fibers ("Fiber <br />Acceptance Testing"). ZAYO shall provide County reasonable advance notice of the date and <br />time of each Fiber Acceptance Testing such that County shall have the. opportunity to have <br />County personnel present to observe the Fiber Acceptance Testing. When ZAYO has <br />determined that the results of the Fiber Acceptance Testing show that the County Dark Fibers, <br />with respect to all Segments included within a Service Order, have been installed and are <br />operating in conformity within the ZAYO specification, as detailed in Exhibit E ("Acceptance <br />Specifications"), ZAYO shall promptly provide County .written notice of the same (a "Notice of <br />Completion," as generally set forth in Exhibit C attached hereto and incorporated herein) and a <br />copy of such test results. <br />7.2 Notice of Completion. Within ten (10) business days of receipt of the Notice of <br />Completion, County shall return to ZAYO the Notice of Completion either (i) accepting the <br />County Dark Fibers with respect to such Service Order, or (ii) rejecting the County Dark Fibers <br />with respect to such Service Order. If County rejects the County Dark Fibers with respect -to a <br />Service Order, County shall also specify in writing, in reasonable detail, the defect or failure in <br />the Fiber Acceptance Testing. If County fails to notify ZAYO of its acceptance or rejection of <br />the Notice of Completion within ten (10) days following County's receipt of the same, County <br />shall be deemed to have accepted the County Dark Fibers With respect to such Service Order. <br />The date of such notice of acceptance or deemed acceptance of the County Dark Fibers with <br />respect to an entire Service Order shall be the "Acceptance Date." In the event of any good faith <br />rejection by County, ZAYO shall take such action as reasonably necessary, and as expeditiously <br />as practicable, to correct or cure such defect or failure, and the process of Fiber Acceptance <br />Testing, notice to County and acceptance shall be repeated with _respect to such rejected County <br />Dark Fibers. The foregoing notwithstanding, if County uses any portion of the County Dark <br />Fibers prior to acceptance, other than for testing County Equipment, such use shall constitute <br />acceptance of such portion of such County Dark Fiber, with an Acceptance Date effective as of <br />the earliest documented use by County. <br />8. Installation of County Equipment <br />8.1 Equipment Responsibility. The installation, use, repair, maintenance and <br />replacement of County Equipment shall be the sole responsibility of County, and ZAYO shall <br />have no obligation or liability under this Agreement or otherwise to install, maintain, repair or <br />replace any County Equipment. <br />8.2 No Interference. County shall not use its facilities, including without limitation <br />11 <br />Anoka County Master Fiber IRU 8.14,10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.